Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance Lowest_1st |
| 2 | L2₹2.1 Cr+₹39.0 L (22.6%)Accepted-Finance | ₹2.1 Cr+₹39.0 L (22.6%) | L2 | Accepted-Finance Lowest_2nd |
| 3 | L3₹2.2 Cr+₹45.2 L (26.2%)Accepted-Finance | ₹2.2 Cr+₹45.2 L (26.2%) | L3 | Accepted-Finance Lowest_3rd |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
16 Mar 2020, 4:00 pmClosed
EXN JK PHC Sgr
Bemina Bye_Pass in premises of 73 BN CRPF HQRs
Construction
2020_DGPJK_93320_4
e-NIT/EE-PHC/19/2019-20
Open Tender
Civil Works
Item Rate
365 days
Beerwah
Please refer NIT/SBD
5 documents required · 5 mandatory
₹15,000
Yes
FA/CAO
₹5.0 L
EXN JK PHC Sgr
6 Jul 2020
20 Feb 2020
20 Mar 2020
24 Feb 2020
16 Mar 2020
28 Feb 2020
26 Feb 2020
Amount
Earth work in excavation by manual/mechanical means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan/over areas (exceeding 30 cm and upto 1.5 m in depth,1.5 m in width as well as 10 sqm on plan ) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 5km from site /edge cutting or as directed by EIC. disposed earth to be leveled and neatly dressed in all kinds of soil including pumping out water caused by springs,tidal or river seepage,broken water means or drains and the like complete during execution of work.
Providing and laying of stone soling hand packed dry including all carriage and cost of material involved complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) (crushed) including all carriages and cost of material involved.
Providing and laying Reinforced cement concrete 1:1:2(1 Cement: 1 coarse sand: 2 graded Stone aggregate 20mm nominal size) (crushed) in retaining walls,return walls ,walls(any thickness), suspended floors, beams, columns, roofs, lintels, balconies, landings, staircase etc excluding cost of centering and shuttering all work up to floor V level including all carriages and cost of materials involved up to site of work complete.
Centering and shuttering including strutting propping etc. and removal of form for foundation, footings basses of columns etc . For mass concrete including all carriages.
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using 12mm ply including all carriages.
Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete. Thermo Mechanically Treated bars. including all carriages .
Supply and filling, watering and compacting of boulders /sand/ nallah muck/ GSB or equivalent under floors/for back filling including all carriages.
Providing and fixing 75 mm dia PVC pipes( Prince,Phenolex or equivalent) in concrete for weep holes as directed by the Site Engineer including all carriages.
M/S SHRI BILAL AHMAD MIR
New Zeal Construction Co
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .