Loading…
Loading…
Tender Value
₹10.4 Cr
EMD Value
₹20.7 L
Closing Date
29 Jun 2026, 6:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Addl Chief Engineer
PWD Zone Jodhpur-II HQ Barmer
Widening and strengthening work on Tapra - Padru - Bawatra Upto Distt. Border Road ( km 14/0 to 26/0)
2026_CEPWD_567417_1
NIT No. 01/2026-27 ACE PWD Zone Barmer
Open Tender
Civil Works
300 days
Balotra
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
Ex EN PWD Dn Balotra
₹20.7 L
Yes
Barmer
12 Jun 2026
12 Jun 2026
30 Jun 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical means In area of non-thorny jungle | 7.2 | Hect. | 10,374 | ₹74,692.8 |
| 2 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per MoRTH Specification Clause 305.4.3 | 16,800 | Sqm | 13 | ₹2,18,400 |
| 3 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 10,074.25 | Cum | 20 | ₹2,01,485 |
| 4 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 32,339.39 | Cum | 45 | ₹14,55,272.55 |
| 5 | Construction of Embankment with Material Obtained from Roadway Cutting (Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 8,171.92 | Cum | 33 | ₹2,69,673.36 |
| 6 | Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 11,745.38 | Cum | 44 | ₹5,16,796.72 |
| 7 | Plant Mix Method (Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means | 10,608.05 | Cum | 773 | ₹82,00,022.65 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with all lead | 18,737.69 | Cum | 1,044 | ₹1,95,62,148.36 |
| 9 | Extra rate for carriage of mixed material additional lead 2nd Km. to 10th Km | 21,240.94 | Cum | 21.25 | ₹4,51,369.98 |
| 10 | Granular Sub-base with Well Graded Material (Table 400-1) (Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.for grading-III Material | 5,416.65 | Cum | 407 | ₹22,04,576.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tendernotice_2.pdf
PDF • 0.42 MB
Tendernotice_3.pdf
PDF • 3.22 MB
Tendernotice_4.pdf
PDF • 8.75 MB
Tendernotice_5.pdf
PDF • 1.69 MB
Tendernotice_6.pdf
PDF • 0.19 MB
BOQ_1009249.xls
BOQ • 0.35 MB
PQ_Tapara_padru_merged.pdf
Additional Documents • 0.69 MB
Download all tender documents and submit your bid