Loading…
Loading…
Tender Value
₹7.5 L
EMD Value
₹74,559
Closing Date
15 Jul 2026, 3:00 pm6d left
CHIEF ENGINEER, KMC
Motijheel
Improvement of road by HMP from H/O Vipin Shukla to H/O Sanju Yadav in swarn jyanti Vihar Sector-05 Ward62 Under Zone02
2026_NNKAN_1165871_1
1573/AA-2/25-26
Open Tender
Civil Works
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹74,559
3 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W cutting or ion embankment in ordinary soil exavation to be done pits not exciding 1.5m including all completion of work. | 20 | cum | 125 | ₹2,500 |
| 2 | P/L Spreading Compacting graded stone aggreate to wet mix Macadam specification including premixing the material by tipper to site laying in uniform layers with pavers in sub base course on well prepared surface and compacting with vibratory roller including all labour materia T&P | - | cum | 3,847 | - |
| 3 | p/A tack Coat with bitumen 80/100 PRESSURE DISTRIBUTER @ 0.20 KG/SQM etc all work. | 1,280 | sqm | 18 | ₹23,040 |
| 4 | Denge Graded Bituminous Macadam (DGBM) P/L dense graded bituminous macadam with 60-90 THP Type HMP producing an average output of 75 tonnes per hour crushed aggregates of specified grading premixed with bitumixed binder @4.5% by weight of total mix and filler transporting the hot mix to work site laying with hydiostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and random rollers to achieve the desired compaction as per MORTH Specification clause NO 507 complete in all respect. | - | MT | 4,940 | - |
| 5 | P/A Bituminous concret with computrised HMP type proucing and average output of 75 tones per hrs crushed aggregates of specipied grading premixed with biyuminour binder (CRMB) 5.4 @ PERCENT OF MIX etc all complete work. | - | MT | 5,510 | - |
| 6 | Painting of Pavement with thermoplastic making paint in Center line, side line, stop line Zebra line etc. | - | sqm | 427 | - |
| 7 | Providing and Fixing of reflective road fixtures. Soller Cats eye type IZ-ASTMD-4956-04 etc all complete. | - | Nos | 312 | - |
| 8 | Making of pedastal including all labour work | - | Nos | 3,840 | - |
| 9 | Cartage of Earth up to 3Km including all completion of work. | - | cum | 116.96 | - |
| 10 | Add 18% G.S.T | 1 | tax | 1,13,734.66 | ₹1,13,734.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
BOQ_2186608.xls
BOQ • 0.30 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid