| 1 | 1₹6.8 LAccepted-Finance | 1 | Accepted-Finance The rate quoted is found lowest as compare to other participants | |
| 2 | 2₹6.9 L+₹7,600.31 (1.12%)Rejected-Finance | 2 | Rejected-Finance The rate quoted is higher than L1 | |
| 3 | 3₹7.3 L+₹54,246.02 (7.97%)Rejected-Finance | 3 | Rejected-Finance The rate quoted is higher than L1 | |
| 4 | 4₹8.0 L+₹1.2 L (17.1%)Rejected-Finance | 4 | Rejected-Finance The rate quoted is higher than L1 |
Tender Value
₹9.6 L
EMD Value
₹19,300
Closing Date
27 Aug 2024, 11:00 amClosed
Director, Forest Training Institute, Wimberlygunj
Office of the Director, Forest Training Institute, Wimberlygunj
Repairing and maintenance of existing Compound Wall at Forest Training Institute Wimberlygunj Full work
2024_DFTIW_15139_1
ANFTI/G-55/2024-25/193 dt. 09.08.2024
Open Tender
Civil Works - Others
Works
180 days
FTI, Wimberlygunj
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,300
Yes
27 Aug 2024
9 Aug 2024
27 Aug 2024
9 Aug 2024
27 Aug 2024
9 Aug 2024
Amount
Providing and fixing up to floor five level precast cement concrete hollow block including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). 40x20x15 cm
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Column, Tie Beam, Cornice
Lintels, beams, plinth beams, girders, bressumers and cantilevers. Tie beam
Columns, Pillars, Piers, Abutments, Posts and Struts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Mild steel tubes hot finished welded type column main rods
12 mm cement plaster of mix : Wall, Column, Cornice, Tie beam
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Two or more coats applied on walls @ 1.25 ltr/10 sqm. over and including one coat of Special primer applied @ 0.75 ltr /10 sqm. Walls
Removing dry or oil bound distemper, Enamel Paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One or more coats on old work. Wall
Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge.50mm average thickness
Transportation of all construction materials from FTI Complex (Road side) to construction Site
N R S COMPANY (BID ID -45232)
E M A CONSTRUCTION (BID ID -45314)
SPR CONSTRUCTION (BID ID -45313)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .