Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.5 CrAdmitted-Finance 4 182 SUKHARIA SHOPPING CENTRE SRI GANGANAGAR RAJASTHAN | SRI GANGANAGAR | SRI GANGANAGAR | RAJASTHAN | L1 | Admitted-Finance | |
| 2 | L2₹87.0 Cr+₹15.5 Cr (21.7%)Admitted-Finance 154 SECTOR 13 HISAR 125005 HARYANA | HISAR | HISAR | HARYANA | 125005 | L2 | Admitted-Finance | |
| 3 | L3₹87.7 Cr+₹16.2 Cr (22.7%)Admitted-Finance 67 VASANTH AVENUE URBAN ESTATE II JALANDHAR 144003 | JALANDHAR | JALANDHAR | PUNJAB | 144003 | L3 | Admitted-Finance | |
| 4 | L4₹88.9 Cr+₹17.4 Cr (24.4%)Admitted-Finance 12 53 CHOPASNI HOUSING BOARD JODHPUR 342 008 RAJ | JODHPUR | JODHPUR | RAJASTHAN | 342008 | L4 | Admitted-Finance | |
| 5 | L5₹91.4 Cr+₹20.0 Cr (28.0%)Admitted-Finance AMARPUR BANKA 813101 | BANKA | BIHAR | 813101 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Pawansut Infra Projects Pvt. Ltd. L1 | Hariom Projects Pvt Ltd L11 | D. K. PROJECT PRIVATE LIMITED L15 | Rabina Enterprises Pvt Ltd L3 | NITYA NAND AND SONS CONTRACTORS PVT LTD L2 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L12 | NSC Projects Pvt. Ltd. L6 | Agarwal Jagdish Construction Company Private Limited L14 | M/s godara infratech and power industries L4 | MUKUL BUILDERS LLP L13 | CHHABINDRA KUMAR PRADHAN L10 | Systematic and Advance Construction Private Limited L9 | Amarpur Construction Company private limited L5 | M/S Kabbu Khirhar L8 | MAHINDER PAL CONSTRUCTIONS PVT LTD L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Sch 'A' Part-I (BUILDING WORK)
Design, drawing and construction of double entry blast pen including annexe on both sides complete in all respects, conforming to permanent specifications, comprising RCC (M-30) framed structure including suitable earth filling on sides and roof top, motorised blast-proof door with peb structural support system, and waterproofing treatment to roof and walls, all as specified & directed and as shown on architectural drawings and tender documents
NOTE:-
I. Rate for bringing approved earth including filling compaction and forming embankment from NGL to MGL is deemed to be included in quoted lump sum and nothing extra shall be permissible.(Ref Schedule 'A' Notes clause no. 2.6(w))
II. Design, Manufacturing, Supply and Installation of Blast Proof Door complete all as shown on drawings and specification shall also included in this item. III The cost for the above is deemed to be included in the quoted rates and nothing extra shall be permissible. | 2 | Each Job | 14,17,00,000 ₹28,34,00,000 | 35,00,00,000 ₹70,00,00,000 | 51,38,67,438 ₹1,02,77,34,876 | 10,98,50,000 ₹21,97,00,000 Lowest | 22,98,00,000 ₹45,96,00,000 | 20,37,04,571 ₹40,74,09,142 | 16,50,22,661 ₹33,00,45,322 | 24,51,00,000 ₹49,02,00,000 | 19,48,03,559 ₹38,96,07,118 | 21,31,00,000 ₹42,62,00,000 | 38,89,90,000 ₹77,79,80,000 | 28,40,00,000 ₹56,80,00,000 | 17,08,21,606.7 ₹34,16,43,213.4 | 28,00,00,000 ₹56,00,00,000 | 23,20,00,000 ₹46,40,00,000 |
| 1.02 | Design, drawing and construction of RCC Counterfort Retaining wall of VIFT type, comprising integrated stem wall and wing walls, in RCC M-30 grade framed structure, sloped as per approved architectural drawings, complete in all respects, conforming to permanent specifications, and including earth filling on the sides, all as specified & directed and as shown on architectural drawings and tender documents.
NOTE:- Rate for bringing approved earth including filling compaction and forming embankment from NGL to MGL is deemed to be included in quoted lump sum and nothing extra shall be permissible.(Ref Schedule 'A' Notes clause no. 2.6(w)) | 4 | Each | 2,50,00,000 ₹10,00,00,000 | 3,45,00,000 ₹13,80,00,000 | 2,01,05,005 ₹8,04,20,020 | 10,94,00,000 ₹43,76,00,000 | 4,48,00,000 ₹17,92,00,000 | 9,92,21,730 ₹39,68,86,920 | 9,60,80,580 ₹38,43,22,320 | 10,06,92,948 ₹40,27,71,792 | 8,48,00,000 ₹33,92,00,000 | 9,48,00,000 ₹37,92,00,000 | 7,02,000 ₹28,08,000 Lowest | 5,00,00,000 ₹20,00,00,000 | 10,35,97,670.17 ₹41,43,90,680.68 | 4,74,50,000 ₹18,98,00,000 | 6,50,00,000 ₹26,00,00,000 |
| 1.03 | Design, Drawing & Construction of Parking shed with steel structure and galvalume sheet complete all as specified and directed and as shown in drawings. | 2 | Each Job | 2,00,00,000 ₹4,00,00,000 | 25,00,000 ₹50,00,000 | 9,52,500 ₹19,05,000 Lowest | 10,50,000 ₹21,00,000 | 25,00,000 ₹50,00,000 | 14,74,825 ₹29,49,650 | 27,62,500 ₹55,25,000 | 15,50,000 ₹31,00,000 | 20,00,000 ₹40,00,000 | 22,20,000 ₹44,40,000 | 44,57,000 ₹89,14,000 | 18,00,000 ₹36,00,000 | 39,14,977.99 ₹78,29,955.98 | 19,00,000 ₹38,00,000 | 21,00,000 ₹42,00,000 |
| 1.04 | Design, Drawing & Construction of water staging with steel structure complete all as specified and directed and as shown in drawings. | 2 | Each Job | 1,50,00,000 ₹3,00,00,000 | 5,00,000 ₹10,00,000 | 5,55,000 ₹11,10,000 | 5,00,000 ₹10,00,000 | 3,00,000 ₹6,00,000 | 4,66,605 ₹9,33,210 | 19,65,000 ₹39,30,000 | 1,00,000 ₹2,00,000 | 75,000 ₹1,50,000 Lowest | 44,40,000 ₹88,80,000 | 8,98,000 ₹17,96,000 | 11,74,000 ₹23,48,000 | 13,91,712 ₹27,83,424 | 15,00,000 ₹30,00,000 | 6,00,000 ₹12,00,000 |
| 2.00 | Total amount of Such 'A' Part-II (SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 38,00,000 ₹38,00,000 | 34,99,988.03 ₹34,99,988.03 | 1,89,21,685 ₹1,89,21,685 | 17,14,994.13 ₹17,14,994.13 | 28,00,000 ₹28,00,000 | 17,34,915 ₹17,34,915 | 15,87,741 ₹15,87,741 Lowest | 29,74,989.82 ₹29,74,989.82 | 17,51,000 ₹17,51,000 | 28,12,000 ₹28,12,000 | 27,99,990.42 ₹27,99,990.42 | 32,00,000 ₹32,00,000 | 27,59,717.53 ₹27,59,717.53 | 31,50,000 ₹31,50,000 | 28,50,000 ₹28,50,000 |
| 3.00 | Total amount of Such 'A' Part-III (INTERNAL ELECTRIC SUPPLY)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 22,00,000 ₹22,00,000 | 20,44,328.68 ₹20,44,328.68 | 33,35,306 ₹33,35,306 | 26,78,070.57 ₹26,78,070.57 | 27,00,000 ₹27,00,000 | 27,79,480 ₹27,79,480 | 27,00,697 ₹27,00,697 | 27,59,843.45 ₹27,59,843.45 | 24,52,689 ₹24,52,689 | 26,64,000 ₹26,64,000 | 20,44,328.68 ₹20,44,328.68 | 18,50,000 ₹18,50,000 Lowest | 22,63,977.89 ₹22,63,977.89 | 19,15,000 ₹19,15,000 | 34,50,000 ₹34,50,000 |
| 4.00 | Total amount of Such 'A' Part-IV (INTERNAL WATER SUPPLY)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 72,000 ₹72,000 | 67,241.86 ₹67,241.86 | 1,02,052 ₹1,02,052 | 1,14,983.58 ₹1,14,983.58 | 94,140 ₹94,140 | 1,31,245 ₹1,31,245 | 1,07,587 ₹1,07,587 | 94,138.6 ₹94,138.6 | 71,999.01 ₹71,999.01 | 1,18,400 ₹1,18,400 | 77,327.15 ₹77,327.15 | 70,000 ₹70,000 | 61,763.66 ₹61,763.66 Lowest | 68,000 ₹68,000 | 1,33,000 ₹1,33,000 |
| 5.00 | Total amount of Such 'A' Part-V (TARMAC/ LINK TT)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 7,10,00,000 ₹7,10,00,000 | 6,47,48,412.2 ₹6,47,48,412.2 | 9,66,68,128 ₹9,66,68,128 | 9,77,70,102.42 ₹9,77,70,102.42 | 9,47,20,120 ₹9,47,20,120 | 10,63,46,805 ₹10,63,46,805 | 8,75,50,114 ₹8,75,50,114 | 7,40,73,345 ₹7,40,73,345 | 7,99,00,000 ₹7,99,00,000 | 9,65,00,000 ₹9,65,00,000 | 7,12,23,253.2 ₹7,12,23,253.2 | 6,67,00,000 ₹6,67,00,000 | 5,30,00,723.38 ₹5,30,00,723.38 Lowest | 6,70,00,000 ₹6,70,00,000 | 8,10,00,000 ₹8,10,00,000 |
| 6.00 | Total amount of Such 'A' Part-VI (ROAD/PATH/CULVERT)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 1,95,00,000 ₹1,95,00,000 | 1,79,98,740.04 ₹1,79,98,740.04 | 2,44,99,252 ₹2,44,99,252 | 2,35,78,349.45 ₹2,35,78,349.45 | 2,28,00,000 ₹2,28,00,000 | 2,08,96,535 ₹2,08,96,535 | 2,13,16,819 ₹2,13,16,819 | 2,33,98,362 ₹2,33,98,362 | 1,85,00,000 ₹1,85,00,000 | 2,29,55,000 ₹2,29,55,000 | 1,97,98,614.04 ₹1,97,98,614.04 | 1,85,40,000 ₹1,85,40,000 | 1,50,93,909.84 ₹1,50,93,909.84 Lowest | 1,80,45,000 ₹1,80,45,000 | 2,00,00,000 ₹2,00,00,000 |
| 7.00 | Total amount of Such 'A' Part-VII (SEWAGE DISPOSAL)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 3,25,000 ₹3,25,000 | 3,05,189.4 ₹3,05,189.4 | 3,84,696 ₹3,84,696 | 5,21,873.87 ₹5,21,873.87 | 3,66,200 ₹3,66,200 | 4,47,575 ₹4,47,575 | 7,14,072 ₹7,14,072 | 4,27,000 ₹4,27,000 | 3,05,189.4 ₹3,05,189.4 | 5,50,000 ₹5,50,000 | 3,05,189.4 ₹3,05,189.4 | 3,00,000 ₹3,00,000 Lowest | 4,23,740.36 ₹4,23,740.36 | 3,25,000 ₹3,25,000 | 4,50,000 ₹4,50,000 |
Tender Value
₹99.9 Cr
EMD Value
₹15 L
Closing Date
3 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER AF SHILLONG ZONE
HQ CHIEF ENGINEER AF SHILLONG ZONE MILITARY ENGINEER SERVICES ELEPHANT FALLS CAMP PO NONGLYER SHILLONG 793009
CONSTRUCTION OF CERTAIN TECHNICAL BUILDINGS AND ALLIED SERVICES AT AF STN PURNEA UNDER AGE (I) (AF) PURNEA
2026_MES_778816_1
88902/PUR/E8
Open Tender
Civil Works
Lump-sum
660 days
Purnea
As per tender documents
8 documents required · 8 mandatory
₹3,000
AGE (I) (AF) Purnea
₹15 L
Yes
27 Oct 2026
15 Jul 2026
5 Oct 2026
15 Jul 2026
3 Oct 2026
26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Sch 'A' Part-I (BUILDING WORK)
Design, Drawing & Construction of Double Entry Blast Pen with permanent specifications including RCC M-30 framed structure including motorized door, earth filling, water proofing treatment over roof, PQC flooring, joints, traverse wall and toe wall, etc complete all as specified and directed and shown on drawings.
Note:- Rate for bringing approved earth, forming embankement from NGL to MGL are included in quoted Lump Sum | 2 | Each Job | - | - |
| 1.02 | Design, Drawing & Construction of Parking shed with permanent specifications complete all as specified and directed and as shown in drawings. | 2 | Each Job | - | - |
| 1.03 | Design, Drawing & Construction of water staging with permanent specifications complete all as specified and directed and as shown in drawings. | 2 | Each Job | - | - |
| 2 | Total amount of Such 'A' Part-II (SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 59,70,767.23 | ₹59,70,767.23 |
| 3 | Total amount of Such 'A' Part-III (INTERNAL ELECTRIC SUPPLY)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 20,76,508.22 | ₹20,76,508.22 |
| - | Total amount of Such 'A' Part-IV (INTERNAL WATER SUPPLY)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 67,241.86 | ₹67,241.86 |
| - | Total amount of Such 'A' Part-V (TARMAC/ LINK TT)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 6,47,48,398.2 | ₹6,47,48,398.2 |
| 6 | Total amount of Such 'A' Part-VI (ROAD/PATH/CULVERT)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 1,79,72,990.04 | ₹1,79,72,990.04 |
| - | Total amount of Such 'A' Part-VII (SEWAGE DISPOSAL)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 3,05,189.4 | ₹3,05,189.4 |
| - | Total amount of Such 'A' Part-VIII (AREA DRAINAGE)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 3,20,34,900.1 | ₹3,20,34,900.1 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 1.PDF
Additional Documents • 0.87 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 10.PDF
Additional Documents • 0.60 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 11.PDF
Additional Documents • 0.60 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 12.PDF
Additional Documents • 0.61 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 13.PDF
Additional Documents • 0.50 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 14.PDF
Additional Documents • 0.56 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 15.PDF
Additional Documents • 0.56 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 16.PDF
Additional Documents • 0.52 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 17.PDF
Additional Documents • 0.55 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 18.PDF
Additional Documents • 0.53 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 18A.PDF
Additional Documents • 0.56 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 2.PDF
Additional Documents • 0.81 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 3.PDF
Additional Documents • 0.74 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 4.PDF
Additional Documents • 0.62 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 5.PDF
Additional Documents • 0.52 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 6.PDF
Additional Documents • 0.51 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 7.PDF
Additional Documents • 0.49 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 8.PDF
Additional Documents • 0.53 MB
TD2_TD2 STRU RCC WALL FOR BULDING_STRU TD 9.PDF
Additional Documents • 0.53 MB
Tenderuploading.pdf
Tender Documents • 9.04 MB
TenderDrawings_AF-PUR-ARCH-26-1-3.pdf
Additional Documents • 0.83 MB
TenderDrawings_AF-PUR-ARCH-26-2-3.pdf
Additional Documents • 0.61 MB
TenderDrawings_AF-PUR-ARCH-26-3-3.pdf
Additional Documents • 0.61 MB
TenderDrawings_AF-PUR-LD-26-1-1.pdf
Additional Documents • 1.32 MB
TenderDrawings_AF-PUR-SCH-26-1-R-1.pdf
Additional Documents • 0.70 MB
BOQ_872301.xls
BOQ • 1.95 MB
SoilInvestigationreport.pdf
Additional Documents • 22.87 MB
TD1_STD265 1-2 RCC SEPTIC TANK 25 TO 100 USERS.pdf
Additional Documents • 0.25 MB
TD1_STD265 2-2.pdf
Additional Documents • 0.12 MB
TD1_STD268 1-3 Structural Stansared Typical Details.pdf
Additional Documents • 0.43 MB
TD1_STD268 2-3.pdf
Additional Documents • 0.38 MB
TD1_STD268-3-3.pdf
Additional Documents • 0.48 MB
TD1_TD178 1-2 RCC SLAB CULVERT.PDF
Additional Documents • 0.47 MB
TD1_TD178 2-2.PDF
Additional Documents • 0.46 MB
TD1_TD180 1-1 HDPE WATER TANK.PDF
Additional Documents • 0.54 MB
TD1_TD181 1-1 DETAILS OF FAN HOOK .PDF
Additional Documents • 0.52 MB
TD1_TD183 1-1 FIXING OG EXHAUST FAN.PDF
Additional Documents • 0.42 MB
TD1_TD184 1-1 DETAILS OF BK STEP ,PLINTH PROTECTION.PDF
Additional Documents • 0.66 MB
TD1_TD185 1-1 RAMP , CURTAIN ROD.PDF
Additional Documents • 0.57 MB
TD1_TD187 1-1 LAV SANITATY FIXTURE.PDF
Additional Documents • 0.55 MB
TD1_TD188 1-1 GULLY TRAP ,NANHI TRAP .PDF
Additional Documents • 0.63 MB
TD1_TD200 1-2 roads & drains.PDF
Additional Documents • 0.59 MB
TD1_TD200 2-2.pdf
Additional Documents • 0.28 MB
TD1_TD23 1-1 DETAILS OF MANHOLES - BRICK.pdf
Additional Documents • 1.30 MB
TD1_TD236 1-2 soak well LATEST.pdf
Additional Documents • 0.49 MB
TD1_TD236 2-2.PDF
Additional Documents • 0.46 MB
TD1_TD240 1-2 valve pit.PDF
Additional Documents • 0.59 MB
TD1_TD240 2-2.PDF
Additional Documents • 0.72 MB
TD1_TD241 1-3 ALUMINIUM DOOR.PDF
Additional Documents • 0.75 MB
TD1_TD241 2-3.PDF
Additional Documents • 0.91 MB
TD1_TD241 3-3.PDF
Additional Documents • 0.74 MB
TD1_TD249 1-1 static water tank , fire fighter tank 25-150kl.pdf
Additional Documents • 0.48 MB
TD1_TD254 1-1 FALSE CEILING.pdf
Additional Documents • 1.92 MB
TD1_TD281 1 & 2 PREVENTION CURE LEAKAGE DAMPNESS.pdf
Additional Documents • 0.41 MB
TD1_TD289 1-2 2-2 GENERAL NOTES & ARCH NORMS OF VARIOUS FITTING FIXTURE.pdf
Additional Documents • 0.39 MB
TD1_TD291 SUNKEN SLAB, LOCAL SUNK, GROUND SINK.pdf
Additional Documents • 0.17 MB
TD1_TD298 1-4 UPVC WINDOWS AND VENTILATORS.pdf
Additional Documents • 0.25 MB
TD1_TD298 2-4.pdf
Additional Documents • 0.21 MB
TD1_TD298 3-4.pdf
Additional Documents • 0.17 MB
TD1_TD298 4-4.pdf
Additional Documents • 0.20 MB
TD1_TD299 1-2 FLUSH DOORS.pdf
Additional Documents • 0.21 MB
TD1_TD299 2-2.pdf
Additional Documents • 0.22 MB
TD1_TD300 1-1 WPC DOORS.pdf
Additional Documents • 0.22 MB
REVISEDDRAWINGS_AF-PUR-ARCH-26-1R-3.pdf
PDF • 0.77 MB
REVISEDDRAWINGS_AF-PUR-ARCH-26-2R-3.pdf
PDF • 0.82 MB
REVISEDDRAWINGS_AF-PUR-LD-26-1-1.pdf
PDF • 1.41 MB
REVISEDDRAWINGS_AF-PUR-LVL-26-1-2.pdf
PDF • 0.42 MB
REVISEDDRAWINGS_AF-PUR-LVL-26-2-2.pdf
PDF • 0.45 MB
REVISEDDRAWINGS_AF-PUR-PARKING-26-1-1.pdf
PDF • 0.16 MB
Corrigendum_5.pdf
PDF • 0.25 MB
Corrigendum_4.pdf
PDF • 0.25 MB
Corrigendum_3.pdf
PDF • 0.25 MB
Corrigendum_2.pdf
PDF • 0.25 MB
Corrigendum_2.pdf
PDF • 0.25 MB
Corrigendum_1.pdf
PDF • 0.25 MB
Corrigendum_1.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .