Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance 47 A ANNA NAGAR 3RD STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | L1 | Accepted-Finance BQR Conditions satisfied | |
| 2 | L2₹5.1 L+₹65,720 (14.9%)Accepted-Finance 2 116 K KARSHINI ILLAM NEW SUNDARAM NAGAR WEST KORAMPALLAM TUTICORIN 628 101 | TUTICORIN | TAMIL NADU | 628101 | L2 | Accepted-Finance BQR Conditions satisfied |
Tender Value
₹5.9 L
EMD Value
₹5,800
Closing Date
15 Mar 2023, 2:00 pmClosed
SE/O/TTPS
O/o SE/O/TTPS
TTPS Operation Circle OE II Breakdown Maintenance of fire hydrant, Mulsifyre, MVWS system and sprinkler system of M.S. pipelines in unit I to V for the period from 01.04.2023 to 31.03.2024
2023_EB_291777_1
SE/O/TTPS/Spec.No.21/23-24
Open Tender
Miscellaneous Works
Item Rate
366 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,800
20 Mar 2023
1 Mar 2023
16 Mar 2023
1 Mar 2023
15 Mar 2023
1 Mar 2023
Amount
Charges for excavation of earth pit to a depth of 2 mtr to facilitate the replacement of punctured portion of the U.G pipe and refilling of earth pit after Completion of work.
Charges for De-watering groundwater from the excavated pit and the water carrying out from the pipeline to facilitated the replacement of the punctured portion of the U.G pipe including the cost of consumables and hire charges for T & P.
Charges for fabrication off 1 No. MS bend out of 200 NB ERW M.S pipe by cutting and welding.
Charges for attending the puncture of the pipelines, gas cutting & removal of the punctured portion of the pipeline, cutting of new spool piece from new pipe, placing the new spool piece in the removed portion and trimming the ends to suit with the cut portion of the pipeline, edge preparation and 3 runs welding the spool piece with the pipeline, charging the pipelines and normalization of the system for the following sizes of pipeline including the cost of consumables and hire charges for T&P. 300 NB pipe
Charges for attending the puncture of the pipelines, gas cutting & removal of the punctured portion of the pipeline, cutting of new spool piece from new pipe, placing the new spool piece in the removed portion and trimming the ends to suit with the cut portion of the pipeline, edge preparation and 3 runs welding the spool piece with the pipeline, charging the pipelines and normalization of the system for the following sizes of pipeline including the cost of consumables and hire charges for T&P. 250NB / 200 NB pipe
Charges for attending the puncture of the pipelines, gas cutting & removal of the punctured portion of the pipeline, cutting of new spool piece from new pipe, placing the new spool piece in the removed portion and trimming the ends to suit with the cut portion of the pipeline, edge preparation and 3 runs welding the spool piece with the pipeline, charging the pipelines and normalization of the system for the following sizes of pipeline including the cost of consumables and hire charges for T&P. 150 NB pipe
Charges for attending the puncture of the pipelines, gas cutting & removal of the punctured portion of the pipeline, cutting of new spool piece from new pipe, placing the new spool piece in the removed portion and trimming the ends to suit with the cut portion of the pipeline, edge preparation and 3 runs welding the spool piece with the pipeline, charging the pipelines and normalization of the system for the following sizes of pipeline including the cost of consumables and hire charges for T&P. 100 NB / 80NB pipe
GAYATHRI ENGINEERING ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .