| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹82.2 CrAccepted-AOC | 1 | Accepted-AOC L1 Tenderer | |
| 2 | 2₹92.5 Cr+₹1.6 Cr (1.73%)Rejected-Finance KUBERAN NAGAR MARANI ROAD THIRUMALPURAM POST MADURAI 14 | MADURAI | TAMIL NADU | 625014 | 2 | Rejected-Finance L2 Tenderer | |
| 3 | 3₹93.9 Cr+₹2.9 Cr (3.22%)Rejected-Finance | 3 | Rejected-Finance L3 Tenderer |
Tender Value
₹75.9 Cr
EMD Value
₹38.2 L
Closing Date
21 Sept 2022, 3:00 pmClosed
Superintending Engineer Highways Projects Circle
O o The Superintending Engineer Highways Projects Circle AlagarKovil Main road K pudur Madurai 625002
Formation of Western Bypass road to Aruppukottai town starting at Km.171 0 of NH45B (New NH38) and connecting SH42 Srivilliputhur-Parthibanur road at Km 61 6 and ends at Km 179 6 of NH45B New NH38 including construction of Road Over Bridge
2022_HWAY_245451_1
1 2022 23 SDO Dated 15 07 2022
Open Tender
Civil Works - Highways
Percentage
730 days
Virudhunagar District
Enclosed Seperatly
3 documents required · 3 mandatory
₹0
₹38.2 L
O o The Superintending Engineer, Highways Project
23 Nov 2022
3 Aug 2022
22 Sept 2022
3 Aug 2022
21 Sept 2022
4 Aug 2022
4 Aug 2022 - 29 Aug 2022
11 Aug 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | Road Work, Junction improvement | - | - | - | - |
| 1 | Clearing and Grubbing light Jungle including uprooting trunk vegetation, Grass , Bushes, Shrubs, Sapplings and Trees girth upto 300mm ,removal of stumps of trees cut earlier or auctioned upto a lead of 1000m including removal and disposal of Top organic soil not exceeding 150mm in Thickness as per Table-201 MORT&H for Ch.0/0-Ch9/905 | 1,95,000 | sqm | 5.05 | ₹9,84,750 |
| 2 | Excavation including removal and satisfactory disposal of all materials SS 20B necessary for the construction of roadway in accordance with the specifications and the lines,gades and cross sections shown in the drawings or as indicated by the Engineer as per MORT&H Vth rev,111,112&201 for cutting the existing earth for Ch.0/0-Ch.9/905 | 347 | Cum | 96.6 | ₹33,520.2 |
| 3 | Forming embankment with cartedearth having a CBR value of 8 including cost of excavation and conveyance to site,spreadingin layers of thickness not exceeding 200mm compacted thickness.Sectioning ,ramming and wateringand compacting by power roller in the required proctor density at 100% compaction for the top500mm thick compaction of the sub grade including watering with all leads for water and compaction by power roller and the surface to the required transverse and longitudinal camber profile and including all other incidental charges , labour charges complete including hire and machinary charges for power roller water sprinkler in all other tools and plants etc., for formation of Sub grade and berms for Ch.0/0-Ch.9/905, approaches of ROB, easing @ Ch.1/800 & 8/0 and Bus bay at Km.4/6 & 4/10. | 2,18,544 | Cum | 594.28 | ₹12,98,76,328.32 |
| 4 | Construction of granular sub-base (GSB) by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-V as per MORTH Vth Rev., 111, 112, 401 & 900. GR-V Bottom Layer for Ch.0/0 Ch.9/905 for approaches of ROB, easing @ Ch.1/800 & 8/0, and Bus Bay at Km 4/6 & 4/10. | 20,430 | Cum | 1,558.95 | ₹3,18,49,348.5 |
| 5 | Construction of granular sub-base (GSB) by providing laying spreading and compacting graded stone aggregate Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-III as per MORTH Vth Rev., 111, 112, 401 & 900. GR-III Top Layer for Ch.0/0-Ch.9/905, approaches of ROB and easing @ Ch.1/800 & 8/0. | 13,301 | Cum | 1,650.91 | ₹2,19,58,753.91 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam(WMM) 250 mm thick specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Vth Rev., 111, 112, 406, 900 for Ch.0/0-Ch.9/905, approaches of ROB, easing @ Ch. 1/800 & Ch.8/0 and Bus Bay at Km. 4/6 & 4/10. | 24,939 | Cum | 1,920.04 | ₹4,78,83,877.56 |
| 7 | Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) as per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, Hire charges for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 for Ch.0/0-Ch.9/905 approaches of ROB, easing @ Ch. 1/800 & Ch.8/0 and Bus Bay at Km. 4/6 & 4/10. | 99,768 | Sqm | 72.74 | ₹72,57,124.32 |
| 8 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, Hire Charges for machinery ,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 for Ch.0/0-Ch.9/905 approaches of ROB, easing @ Ch. 1/800 & Ch.8/0 and Bus Bay at Km 4/6 & 4/10. | 99,768 | Sqm | 17.42 | ₹17,37,958.56 |
| 9 | Providing and laying 50-75 mm consolidated thick Dense bituminous macadam using 0.20 cum for 26.50-13.20mm, 0.43cumof13.20-2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 /VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9 m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 for Ch.0/0-Ch.9/905 approaches of ROB, easing @ Ch. 1/800 & Ch.8/0 and Bus Bay at Km. 4/6 & 4/10. | 6,935.5 | Cum | 10,895.58 | ₹7,55,66,295.09 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_290283.xls
BOQ Document • 0.48 MB
102814705.pdf
Tender Document • 0.20 MB
Drawing.pdf
Tender Document • 5.22 MB
102814707.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .