Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC 35 238 V O C NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹8.0 L Quoted ₹7.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.2 LRejected-AOC 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | ₹7.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | NEW SRI VENKATESWARA ENGINEERING WORKS L1 | SRI VAITHEESWARA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Overhauling of OLCTC system pump:- Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump. | 2 | Nos | 4,375 ₹8,750 Lowest | 4,500 ₹9,000 |
| 2.00 | Dismantling of the Bearing Covers, Bearing Bracket, Dismantling of shaft sleeve and dismantling of the casing etc., | 2 | Nos | 7,514 ₹15,028 Lowest | 7,800 ₹15,600 |
| 3.00 | Dismantling the impeller Assembly from the Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably | 2 | Nos | 7,518 ₹15,036 Lowest | 7,800 ₹15,600 |
| 4.00 | Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the sleeve, Bearing Bracket Bearings, Bearing Covers and assembling the coupling in shaft | 2 | Nos | 7,514 ₹15,028 Lowest | 7,800 ₹15,600 |
| 5.00 | Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings, and painting of the pump base concrete structure, with Oil Distemper (Paint under Contractor’s Scope) | 2 | Nos | 16,412 ₹32,824 Lowest | 16,500 ₹33,000 |
| 6.00 | Opening of condenser water box manhole door, cleaning of water box and tubes and removing the entrapped debris (Shells) from the CW inlet pipe line bends. Opening of water box man hole door, arranging the safety ropes and safety equipment’s, cleaning the water box, removal of debris from the water box and tubes and closing of man hole doors with new gaskets. | 1 | Unit | 11,441 ₹11,441 Lowest | 11,500 ₹11,500 |
| 7.00 | Closing of front & Rear manhole doors of 16 Nos for Condenser LHS & RHS. Manhole doors after renewing all the manhole door rubber chords and Providing and removing condenser jack pipes during vacuum tightness test. | 1 | LS | 19,763 ₹19,763 Lowest | 19,800 ₹19,800 |
| 8.00 | Inspection of OLCTC System Ball collecting screen:
a) Opening of OLCTC System Ball collecting screen manhole doors LHS & RHS-2Nos. and cleaning the debris and closing of manhole doors with renewal of gaskets. | 1 | Unit | 12,029 ₹12,029 Lowest | 12,200 ₹12,200 |
| 9.00 | Cleaning and painting works including cost of paintings.
Cleaning and painting of CW Inlet & outlet pipe lines and CW Box of condenser(LHS & RHS) with double coat , Two Coat of side (LHS & RHS) painting of CW Inlet & outlet pipe lines of condenser in outer side (LHS & RHS) | 345 | m2 | 98 ₹33,810 Lowest | 99 ₹34,155 |
| 10.00 | Overhauling of 200mm condenser air release cum vacuum breaking valve and its isolation gate valves and gear mechanism
Dismantling the isolation valve, air release cum vacuum breaking valve of size 200mm,Cleaning all the parts, lapping the seating surface like valve seat and gates, checking blue contact, changing the internals if necessary and reassembling the valves with new gland packing’s, “O” Rings etc. | 2 | Nos | 11,102 ₹22,204 Lowest | 11,200 ₹22,400 |
Tender Value
Refer Docs
EMD Value
₹8,200
Closing Date
11 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPSI TM Unit I Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well etc
2026_EB_648070_1
CE / MTPS-I / SE / M-I / TM /OT. 440 / 2025-26
Open Tender
Power/Energy Projects/Products
Works
10 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹8,200
Yes
30 Jul 2026
28 Jan 2026
12 Feb 2026
28 Jan 2026
11 Feb 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Overhauling of OLCTC system pump:- Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump. | 2 | Nos | - | - |
| 2 | Dismantling of the Bearing Covers, Bearing Bracket, Dismantling of shaft sleeve and dismantling of the casing etc., | 2 | Nos | - | - |
| 3 | Dismantling the impeller Assembly from the Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably | 2 | Nos | - | - |
| 4 | Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the sleeve, Bearing Bracket Bearings, Bearing Covers and assembling the coupling in shaft | 2 | Nos | - | - |
| 5 | Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings, and painting of the pump base concrete structure, with Oil Distemper (Paint under Contractor’s Scope) | 2 | Nos | - | - |
| 6 | Opening of condenser water box manhole door, cleaning of water box and tubes and removing the entrapped debris (Shells) from the CW inlet pipe line bends. Opening of water box man hole door, arranging the safety ropes and safety equipment’s, cleaning the water box, removal of debris from the water box and tubes and closing of man hole doors with new gaskets. | 1 | Unit | - | - |
| 7 | Closing of front & Rear manhole doors of 16 Nos for Condenser LHS & RHS. Manhole doors after renewing all the manhole door rubber chords and Providing and removing condenser jack pipes during vacuum tightness test. | 1 | LS | - | - |
| 8 | Inspection of OLCTC System Ball collecting screen:
a) Opening of OLCTC System Ball collecting screen manhole doors LHS & RHS-2Nos. and cleaning the debris and closing of manhole doors with renewal of gaskets. | 1 | Unit | - | - |
| 9 | Cleaning and painting works including cost of paintings.
Cleaning and painting of CW Inlet & outlet pipe lines and CW Box of condenser(LHS & RHS) with double coat , Two Coat of side (LHS & RHS) painting of CW Inlet & outlet pipe lines of condenser in outer side (LHS & RHS) | 345 | m2 | - | - |
| 10 | Overhauling of 200mm condenser air release cum vacuum breaking valve and its isolation gate valves and gear mechanism
Dismantling the isolation valve, air release cum vacuum breaking valve of size 200mm,Cleaning all the parts, lapping the seating surface like valve seat and gates, checking blue contact, changing the internals if necessary and reassembling the valves with new gland packing’s, “O” Rings etc. | 2 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_776979.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].