Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹48.6 LAccepted-AOC FLAT NO 10 2ND FLOOR SODDHI TERRECSES RAYKAR NAGAR DHAYARI PUNE 411041 | PUNE | PUNE | MAHARASHTRA | 411041 | L-1 | Accepted-AOC rates are the lowest | |
| 2 | L-2₹48.6 L+₹5,228 (0.11%)Rejected-Finance 155 SHAMPURA COLONY BELA ROAD RUPNAGAR 140001 | RUPNAGAR | RUPNAGAR | PUNJAB | 140001 | L-2 | Rejected-Finance Quoted rates are high | |
| 3 | L-3₹50.0 L+₹1.4 L (2.84%)Rejected-Finance VILLAGE BUDMAJRA NEAR BALONGI SALES TAX BARRIER DISTRICT MOHALI PUNJAB | MOHALI | MOHALI | PUNJAB | L-3 | Rejected-Finance Quoted rates are high | |
| 4 | Not Admitted-Finance 1 VISHVAS NAGAR GONIANA ROAD P O NFL BATHINDA 151 003 | BATHINDA | BATHINDA | PUNJAB | 151003 | - | Not Admitted-Finance Technical OK |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
6 Oct 2021, 11:30 amClosed
Dy. chief Engineer/ MM-1
Dy. Chief Engineer/ Mechanical Mtc. Circle-I, OM, GHTP, Lehra Mohabbat
of Boiler Feed pumps, Condensate Extraction Pumps, CW Pumps, Vacuum Pumps, Turbine Aux. Cooling Water Pumps, BACW Pumps, Boiler fill Pumps, Hotwell Make Up Pumps, Stator water make up pump of GHTP lehra mohabbat stage 1 and 2 on lump sum basis
2021_POWER_71625_1
30 MM1/TGP /OM /GHTP/20-21
Open Tender
Power/Energy Projects/Products
Tender cum Auction
365 days
Dy. Chief Engineer/MM-I
Firm should have valid registration for bid participation
2 documents required · 2 mandatory
₹1,180
₹1.2 L
Yes
11 Nov 2021
8 Sept 2021
8 Oct 2021
8 Sept 2021
6 Oct 2021
8 Sept 2021
To attend various Routine, Preventive and Breakdown Maintenance jobs (Mechanical jobs) of Boiler Feed pumps, Condensate Extraction Pumps, CW Pumps, Vacuum Pumps, Turbine Aux. Cooling Water Pumps, BACW Pumps, Boiler fill Pumps, Hot-well Make Up Pumps and Stator Water make up Pumps, ACW Pumps, SGDMCW Pumps, TGDMCW Pumps, TG Cycle Make Up Pumps etc.of 2x210 MW & 2x250 MW Units falling under TG Pumps Maintenance Cell of GHTP Lehra Mohabat.
On lump sum basis as per scope of work in Section-VIII- A considering any one unit running and keeping balance three Units available for running as and when required (except during overhauling).
On lump sum basis as per scope of work in Section-VIII -A for running of all the four units (except during overhauling).
To attend to various jobs during annual overhaul pertaining to Boiler Feed pumps, Condensate Extraction Pumps, CW Pumps, Vacuum Pumps, Turbine Aux. Cooling Water Pumps, BACW Pumps, Boiler fill Pumps, Hot-well make up pumps and Stator Water make up Pumps, ACW Pumps, SGDMCW Pumps, TGDMCW Pumps, TG Cycle Make Up Pumps etc. of 2x210 MW & 2x250 MW Units falling under TG Pumps Maintenance cell on lump-sum basis of any one unit of GHTP Stage-I or Stage-II as per scope of work in Section-VIII -B.
M/S SODHI ERECTORS
CHOPRA ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .