Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC 1 71 SREEMANTA DEY LANE KOLKATA 700012 W B | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹14.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹14.0 LRejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | ₹14.0 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹14.1 LRejected-Finance 0 JANAI JANAI CHANDITALA HOOGHLY WEST BENGAL 712304 UDYAM WB 07 0059321 | HOOGHLY | WEST BENGAL | 712304 | ₹14.1 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | ORIENTAL ENGINEERING CO. L1 | WEST BENGAL ENGINEERING CO. L2 | DAS ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | H/L CLEAR WATER
Labour charges for Operation and guarding of 3nos (2W+1S) HSC H/L pumping machinery including others pumps, MCC panels individual motor controll starter panels, electrical gadgets, All valves, level indicators etc and internal & external illumination complete with all other electrical accessories and ancilliaries for round the clock supply of water by engaiging 2(Two) nos operating personnel as per direction of E.I.C | 365 | /Day | 1,243.8 ₹4,53,987 | 1,250 ₹4,56,250 | 1,254 ₹4,57,710 |
| 2.00 | L/L Switch Room
Labour charges for Operation and guarding of 3(three) nos LL switch room for operation and guarding of Pumping Machinery including Operation of Valves, disinfection arrangement, internal & external illuminations as per specification and round the clock by engaiging 3(Three) nos operating personnel guarding of the whole installation with all accessories complete as per direction of EIC. | 365 | /Day | 1,865.7 ₹6,80,980.5 | 1,870.25 ₹6,82,641.25 | 1,874.25 ₹6,84,101.25 |
| 2.10 | Add ESI 3.25 % of total labour item no- 1 & 2 | 365 | /Day | 79.1 ₹28,871.5 | 83.2 ₹30,368 | 87.6 ₹31,974 |
| 2.20 | Add EPF 13 % of total labour item no- 1 & 2 | 365 | /Day | 316.55 ₹1,15,540.75 | 321.25 ₹1,17,256.25 | 325.95 ₹1,18,971.75 |
| 3.00 | Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules 1956 with latest amendments and overhead expenditures for the above period. | 12 | /month | 8,678 ₹1,04,136 | 8,683 ₹1,04,196 | 8,688 ₹1,04,256 |
| 4.00 | Add: 1% Cess | 1 | L.S | 13,835.16 ₹13,835.16 | 13,907.12 ₹13,907.12 | 13,970.13 ₹13,970.13 |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
6 Apr 2026, 6:00 pmClosed
Executive Engineer, BMD, PHED
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Operation, and Guarding of pumping machineries and other equitments at CWR site of Ratanpur and Adjoining Mouzas Ground Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block Onda Dist- Bankura
2026_PHED_1015681_17
WBPHED/EE/BMD/NIeT-24 OF 2025-2026
Open Tender
MECHANICAL
365 days
Bankura
Please refer Tender documents.
5 documents required · 5 mandatory
₹29,000
Yes
26 May 2026
19 Mar 2026
9 Apr 2026
19 Mar 2026
6 Apr 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1H/L CLEAR WATER Labour charges for Operation and guarding of 3nos (2W+1S) HSC H/L pumping machinery including others pumps, MCC panels individual motor controll starter panels, electrical gadgets, All valves, level indicators etc and internal & external illumination complete with all other electrical accessories and ancilliaries for round the clock supply of water by engaiging 2(Two) nos operating personnel as per direction of E.I.C | |||||
| 2L/L Switch Room Labour charges for Operation and guarding of 3(three) nos LL switch room for operation and guarding of Pumping Machinery including Operation of Valves, disinfection arrangement, internal & external illuminations as per specification and round the clock by engaiging 3(Three) nos operating personnel guarding of the whole installation with all accessories complete as per direction of EIC. | |||||
| 2.1 | Add ESI 3.25 % of total labour item no- 1 & 2 | - | /Day | - | - |
| 2.2 | Add EPF 13 % of total labour item no- 1 & 2 | - | /Day | - | - |
| 3Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules 1956 with latest amendments and overhead expenditures for the above period. | |||||
| 4Add: 1% Cess | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.86 MB
Tendernotice_2.pdf
PDF • 1.11 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_2515132.xls
BOQ • 0.34 MB
Specificationall.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid