Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.8 LAdmitted-Fee/PreQual/Technical/Finance | -14.75% | ₹32.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹69.4 L+₹36.5 L (111.1%)Admitted-Fee/PreQual/Technical/Finance FLAT NO 101 FIRST FLOOR SURVEY NO 28 HISSA NO 7B 1A PARIHAR BHATI COMPLEX KALE PADAL ROAD SASANE NAGAR HADAPSAR PUNE MAHARASHTRA 411028 | PUNE | MAHARASHTRA | 411028 | +80.00% | ₹69.4 L+₹36.5 L (111.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹73.2 L+₹40.4 L (122.9%)Admitted-Fee/PreQual/Technical/Finance | +90.00% | ₹73.2 L+₹40.4 L (122.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.5 L
EMD Value
₹38,528
Closing Date
21 Sept 2026, 5:00 pmClosed
SE,Hydrology and Interstate Matter,Burla
SE, Hydrology and Interstate Matter,Burla
Installation and Calibration of new River Gauge Post in the downstream at Seorinarayan Barrage on river Mahanadi under Hirakud Dam Project for the year 2026-27.
2026_CEBBU_140819_1
SEH AND ISM -03/2026-27
Open Tender
Civil Works - Others
Percentage
Seorinarayan, chhattisgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹38,528
Yes
25 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
11 Sept 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50m initial lead & 1.50m initial lift including rough dressing and breaking clouds to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and as per direction of the Engineer in Charge. | 5.63 | Cum | 282.9 | ₹1,592.73 |
| 2 | Filling foundation and plinth with filling sand including watering and ramming with cost, carriage, royality etc. complete as per direction of Engineer in- Charge. | 0.51 | Cum | 456.2 | ₹232.66 |
| 3 | Cement concrete (1:3:6) with 40mm size H.g.c.b metals with cost,carriage & Royalty etc. complete as per direc-tion of Engineer inCharge . | 1.06 | Cum | 5,685.7 | ₹6,026.84 |
| 4 | Cement Concrete (1:1.5:3) with 12mm size H.G.C.B chips for R.C.C works including hoisting and laying per one Cum with all cost , carriage & Royalty etc complete as per direction of Engineer in Charge | 2.47 | Cum | 8,048.2 | ₹19,879.05 |
| 5 | Rigid smooth centring and shuttering for R.C.C works including false work and dismantling them after casting including cost of all materials and cost of all labours etc, complete in all respect in ground floor as per direction of Engineer-in-charge. A (B)R.C.C beams , columns, grider and bressmer, etc | 6.24 | Sqm | 1,239 | ₹7,731.36 |
| 6 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, conveyance and labour etc. complete as per direction of the Engineer-in-charge. | 0.63 | Qntl | 9,163.4 | ₹5,772.94 |
| 7 | Priming one coat with any approved water bound Primer in Plastered surface work including cost of paint, materials, Labour T & P etc. complete as per direction of Engineer inCharge. | 6.24 | Sqm | 83.8 | ₹522.91 |
| 8 | Painting two coat with any approved shade of enamel paint on new wood / iron work including cost, conveyance, taxes of all materials and cost of all labours and T&P required for the work etc. complete as per direction of Engineer-in-charge. | 6.24 | Sqm | 191.8 | ₹1,196.83 |
| 9 | Calibration of existing river gauge (calculation of river discharge with respect to existing river gauge) 1.Deployment of Technical person for Data Acquisition 2. Data processing and preparation of reports both soft copy and hard copy including stationary expenses 3. Boat hiring charges with man power and other expenses 4.Hiring of vehicle with fuel and lubricant for survey work 5.Lodging and boarding facility for staff 6.Calibration of existing river gauge and preparation of G/D curve, profile comparison with existing one | 180 | Per Day | 21,166 | ₹38,09,880 |
stage.html
html • 0.02 MB
finance_609283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.00 MB
DTCN.pdf
Tender Documents • 2.58 MB
BOQ_609283.xls
BOQ • 0.27 MB
Corrigendum_1.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .