Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC 10B DR LAHIT BANERJEE SARANI GROUND FLOOR KOLKATA 700 073 | KOLKATA | KOLKATA | WEST BENGAL | 700073 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹24.8 L+₹11,562.60 (0.47%)Rejected-Finance 33 PEMANTLE STREET KOLKATA 700016 | KOLKATA | KOLKATA | WEST BENGAL | 700016 | L2 | Rejected-Finance bidder is not L1 | |
| 3 | L3₹32.3 L+₹7.7 L (31.2%)Rejected-Finance | L3 | Rejected-Finance bidder is not L1 | |
| 4 | l4₹37.6 L+₹13.0 L (52.6%)Rejected-Finance 12 HAJI MD MOHASIN SQUARE KOL 700016 | KOLKATA | KOLKATA | WEST BENGAL | 700016 | l4 | Rejected-Finance bidder is not L1 | |
| 5 | L5₹42.3 L+₹17.6 L (71.5%)Rejected-Finance B2 49 73 1 SARADA PALLY ROAD P O BATANAGAR MAHESHTALA KOLKATA 700 140 | KOLKATA | SOUTH 24 PARGANAS | WEST BENGAL | 700140 | L5 | Rejected-Finance bidder is not L1 |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
16 Apr 2025, 2:00 pmClosed
Executive Engineer-I,CKHED,PWDte.
Central Kolkata Health Electrical Division, P.W.Dte. P-5, CIT Road, 2nd Floor, Moulali, Kolkata
Annual Comprehensive Maintenance of 1.5 TR / 2.0 TR Window / Split AC, 3.0 TR /5.0 TR /7.5 TR HAT AC / 5.5 TR / 8.5 TR/8.8 TR/11 TR/16.5 TR/17 TR Ductable Split Air-conditioners at different buildings of CNMC and H (for 1 year)
2025_WBPWD_827917_1
WBPWD/EE-I/CKHED/eNIT132/24-25
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
CNMCH
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.0 L
Central Kolkata Health Electrical Division, P.W.Dt
12 Aug 2025
17 Mar 2025
21 Apr 2025
17 Mar 2025
16 Apr 2025
24 Mar 2025
24 Mar 2025
Amount
Annual Comprehensive maintenance of 1.5 Tr. Window type AC machine as per terms & conditions. (1.5 x 4 Nos = 6Ton)
Annual Comprehensive maintenance of 2.0 Tr. Window type AC machine as per terms & conditions. ( 2 x 44 Nos = 88 Ton)
Annual Comprehensive maintenance of 1.5 Tr. Split type AC machine as per terms & conditions. (1.5 x 49 Nos = 73.50 Ton)
Annual Comprehensive maintenance of 2.0 Tr. Split type AC machine as per terms & conditions. (2 x 80 Nos = 160 Ton)
Annual Comprehensive maintenance of 4.5 TR tower type AC machine as per terms & conditions. (4.5 x 5 Nos = 22.50 Ton)
Annual Comprehensive maintenance of 4.6 TR tower type AC machine as per terms & conditions. (4.6 x 2 Nos = 9.20 Ton)
Annual Comprehensive maintenance of 2.5 TR tower type AC machine as per terms & conditions. (2.5 x 3 Nos = 7.5 Ton)
Annual Comprehensive maintenance of 7.5 TR Concealed Split (HAT Type) AC as per terms & conditions. (7.5 x 38 Nos = 285 Ton)
Annual Comprehensive maintenance of 5.0 TR Concealed Split (HAT Type) AC as per terms & conditions. (5 x 35 Nos = 175 Ton)
Annual Comprehensive maintenance of 4.0 TR Concealed Split (HAT Type) AC as per terms & conditions. ( 4 x 15 Nos = 60 Ton)
Annual Comprehensive maintenance of 3.0 TR Concealed Split (HAT Type) AC as per terms & conditions. ( 3 x 31 Nos = 93 Ton)
Annual Comprehensive maintenance of 2.5 TR Concealed Split (HAT Type) AC as per terms & conditions.(2.5 x 2 Nos = 5 Ton)
Annual Comprehensive maintenance of 2.0 TR Concealed Split (HAT Type) AC as per terms & conditions. (2 x 42 Nos = 84 Ton)
Annual Comprehensive maintenance of 1.5 TR Concealed Split (HAT Type) AC as per terms & conditions. (1.5 x 18 Nos = 27 Ton)
Annual Comprehensive maintenance of 2.5 TR Cassette AC as per terms & conditions. (2.5 x 6 Nos = 15 Ton)
Annual Comprehensive maintenance of 8.8 TR Ductable Split AC as per terms & conditions. ( 8.8 x 2 Nos =17.60 Ton)
Annual Comprehensive maintenance of 8.5 TR Ductable Split AC as per terms & conditions. (8.5 x 14 Nos = 119 Ton)
Annual Comprehensive maintenance of 5.5 TR Ductable Split AC as per terms & conditions. (5.5 x 4 Nos = 22 Ton)
Annual Comprehensive maintenance of 11 TR Ductable Split AC as per terms & conditions. (11 x 15 Nos = 165 Ton)
Annual Comprehensive maintenance of 16.5 TR Ductable Split AC as per terms & conditions.(16.5 x 7 Nos = 115.50 Ton)
Annual Comprehensive maintenance of 17 TR Ductable Split AC as per terms & conditions.(With Negative Pressure) (17 x 2 Nos = 34Ton)
Annual Comprehensive maintenance of 16.5 TR Ductable Split AC as per terms & conditions.(With Negative Pressure) (16.5 x 2 Nos = 33Ton)
Annual Comprehensive maintenance of 11 TR Ductable Split AC as per terms & conditions.(With Negative Pressure) (11 x 3 Nos = 33 Ton)
Single Phase Air Curtain installed at Surgical Building, Ground Floor. 2Nos
Rates are incluisive of all taxes, cess & man power needed as per terms and condition of tender notice SL.No-3 in (B) General Terms & Conditions.
Bidder have to ensure payment to work person current minimum rate of wages of Jt. Labour Commissioner, Govt. of W.B.
MILLENNIUM AIRCON (BID ID -6277076)
MODERN TECHNO CORPORATION (BID ID -6324118)
MODERN REFRIGERATION AND ELECTRICAL WORKS (BID ID -6321741)
Chakraborty Air Conditioning (BID ID -6293485)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .