| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | 1 | Accepted-AOC The work was awarded to the L1 contractor Thiru P.Maitheenraj,Kovilpatti. | |
| 2 | 2₹2.0 L+₹1,591 (0.79%)Accepted-AOC | 2 | Accepted-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
4 Jan 2021, 2:00 pmClosed
SE / TEDC / TUTICORIN
131,Ettaiapuram Road, Tuticorin - 628002.
Improvement works to Section office building at 110 / 33 - 11 KV Grid Eppodumvendran SS premises
2020_EB_188034_1
Specn. no 33 / 2020 - 21 of SE / TEDC / TTN
Open Tender
Civil Works
Item Rate
60 days
TNEB Premises, Eppodumvendran
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
SE / TEDC / TUTICORIN
₹2,500
Yes
17 May 2021
17 Dec 2020
5 Jan 2021
17 Dec 2020
4 Jan 2021
17 Dec 2020
17 Dec 2020 - 4 Jan 2021
Amount
Dismantling the existing damaged RCC and retrieving from steels & clearing away the debrises from the site as directed by the engineer at site including cost of all labours, lead, lift, t & p,devolution to stores, etc., complete.
Dismantling the existing damaged one course of pressed tiles in cement mortar & clearing away from the site as directed by the engineer at site including cost of labours,lead,lift,t & p, etc., complete.
Clean removal of cement plaster from walls & ceiling and clearing away the debrises from the site as directed by the engineer at site including scaffolding charges,cost of labours, lead, lift, t & p, etc., complete.
Chipping the existing concrete and roughening the surface for future bonding and thorough cleaning the surface including cost of all materials,labours,lead,lift,t & p, etc., complete.
Providing centering and shuttering for RCC works upto 3m heights using M.S. sheets of size 90 x 60 cm with BG 10 guage stiffened with welded M.S. angles of size 25 x 25 x 3 mm laid over silver oak scantlings of size 10 x 6.50 cm at 90 cm c/c & supported by casurina props 10 to 13 cm. dia at 75 cm c/c complying with standard specifications including cost of all materials, labours, lead, lift, etc., complete.
Supplying & providing TMT rods including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials,labours,lead, lift, etc., complete.
Providing RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal and OPC 53 grade cement including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc., complete but excluding cost of reinforcement and form work.
Brick work in CM 1:5 using class-II chamber burnt bricks and OPC 53 grade cement including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc., complete.
Removing the existing doors & windows including removal of frames, hinges & fastenings including cost of all labours, lead, lift, t & p, refixing / devolution to stores, etc., complete.
Labour charges for refixing the existing doors & windows along with frames in positon safely including cost of replacing the damaged lock & kheel materials, labours, lead, lift, t & p, etc., complete.
Supplying and fixing in position of steel window MS shutter sheets only excluding outer and shutter frames, cost of all other materials, labour, lead, lift, including one coat of red oxide primer, etc., complete.
Providing 3mm thk. pin headed glass for window shutter panels including cost of plain glass, lappum, labour charges, nails, lead, lift, etc., complete.
Providing PCC 1:4:8 with OPC 53 Grade cement and 40mm size machine crushed HBG metal including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc., complete.
Ceiling plastering with OPC 53 grade cement in C.M.1:3, 10 mm thick for RCC works including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc., complete.
Plastering with C.M 1:5, 12 mm thick with OPC 53 Grade cement including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc., complete.
Floor finishing with OPC 53 grade cement in C.M 1:3, 12 mm thick with required slope including plasticiser at the rate of 100 ml per bag of cement, cost of all materials, labours, lead, lift, curing, etc., complete.
Terrace flooring of one course of pressed tiles 230 x 230 x 20mm over CM 1:3, 20mm thk. with OPC 53 grade cement including plasticiser at the rate of 100 ml per bag of cement & mixed with crude oil 10% by weight of cement and pointing with the same cement mortar 1:3 & plasticiser with required slope over RCC roof slab including cost of all materials, labours, lead, lift, crude oil, curing, etc., complete.
Terrace tiles pointing with OPC 53 grade cement in C.M 1:3 to full depth of tiles including plasticiser at the rate of 100 ml per bag of cement, cost of all other materials, labours, lead, lift, curing, etc., complete.
White washing two coats with shell lime, putty and fevicol for ceiling & toilet inner walls including cost of all other materials, labours,lead,lift,scaffolding, etc., complete.
Providing two coats of oil bound distemper of approved quality, brand & colour for inner wall surfaces including putty, cost of all other materials, scaffolding charges, thorough scrapping,labours,lead,lift, etc., complete.
Providing two coats of ready mixed Plastic emulsion painting of approved colour & quality over one coat of emulsion primer on outer walls including putty, cost of all other materials, scaffolding charges, safety measures like belt, rope, thorough scrapping,labours,lead,lift,etc.,complete.
Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, thorough cleaning of surface, labours, lead, lift, etc., complete.
Providing 110 mm dia ( 4kg / cm2 ) PVC approval quality and best variety (Finolex or equivalent) pipe including specials, T.W plugs, clamps, screws, labours, lead, lift, etc., complete for rainwater downfall pipe.
Supplying, jointing and fixing in position of 110mm ( 6 kg / cm2 ) PVC pipe ISI make for sewage line inclusive of specials (bend), including cost of all lead, lift, labour charges, etc. complete and as directed by the Engineer at site.
K.T. PAUL RAJ
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .