| 1 | L1₹2.3 LAdmitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L1 | Admitted-Finance | |
| 2 | L2₹2.3 L+₹1,764.10 (0.77%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | STANDARD CAPACITORS L2 | Premier Engineering Company L1 |
|---|---|---|---|---|---|
| 1.01 | Repair/Renovation of APFC Panel 110 kVAr: 01 No
Dismantling of defective capacitor units from the APFC Panel after suitably discharging the left-over charge on capacitor to ensure safety of the working persons along with dismantling of capacitors, APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site | 1 | Job | 9,500 ₹11,210 Lowest | 11,500 ₹13,570 |
| 1.02 | Replacement of defective super heavy-duty capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable and entry, mounting structure and hardware etc- make standard. | 100 | Kvar | 44,800 ₹52,864 Lowest | 45,000 ₹53,100 |
| 1.03 | Banking of capacitors of various capacities with multistrand copper wires & lugs/ aluminium bus bars and mounting arrangement for parallel connection to from suitable rating capacitor bank. | 100 | Kvar | 14,500 ₹17,110 Lowest | 15,000 ₹17,700 |
| 1.04 | Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contractor coils for switching On-Off required number of capacitors as per requirement to achieve target power factor. make-standard | 1 | No | 23,300 ₹27,494 Lowest | 23,500 ₹27,730 |
| 1.05 | Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties for utility companies. | 1 | Job | 9,500 ₹11,210 Lowest | 9,500 ₹11,210 Lowest |
| 1.06 | Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. make standard/ EPCOS | 1 | No | 4,375 ₹5,162.5 Lowest | 4,375 ₹5,162.5 Lowest |
| 1.07 | Replacement of defective capacitor duty contactors suitable for 16 KVAr capacitor with new capacitor duty contactor. make standard/ EPCOS | 1 | No | 3,140 ₹3,705.2 Lowest | 3,140 ₹3,705.2 Lowest |
| 1.08 | Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank- make L&T/EPCOS/Standard | 2 | No | 2,900 ₹3,422 Lowest | 2,900 ₹3,422 Lowest |
| 1.09 | Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank- make L&T/EPCOS/Standard | 1 | No | 1,150 ₹1,357 Lowest | 1,150 ₹1,357 Lowest |
| 1.10 | Supply of Push buttons for replacement of defective push buttons to switch ON and OFF capacitor banks in manual mode make- FTC/Standard/ L&T | 3 | No | 510 ₹601.8 Lowest | 510 ₹601.8 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
18 Nov 2025, 3:00 pmClosed
EE SDW VII
NSTP Coronation Pillar Delhi 110009
Repair Renovation of Standard make APFC Panel for improvement of Power factor at Model Town SPS
2025_DJB_281018_3
NIT No 13 (2025-26)
Open Tender
Miscellaneous Works
Works
30 days
NSTP Coronation Pillar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Online
₹4,700
16 Dec 2025
11 Nov 2025
18 Nov 2025
11 Nov 2025
18 Nov 2025
11 Nov 2025
Repair/Renovation of APFC Panel 110 kVAr: 01 No Dismantling of defective capacitor units from the APFC Panel after suitably discharging the left-over charge on capacitor to ensure safety of the working persons along with dismantling of capacitors, APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site
Replacement of defective super heavy-duty capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable and entry, mounting structure and hardware etc- make standard.
Banking of capacitors of various capacities with multistrand copper wires & lugs/ aluminium bus bars and mounting arrangement for parallel connection to from suitable rating capacitor bank.
Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contractor coils for switching On-Off required number of capacitors as per requirement to achieve target power factor. make-standard
Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties for utility companies.
Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. make standard/ EPCOS
Replacement of defective capacitor duty contactors suitable for 16 KVAr capacitor with new capacitor duty contactor. make standard/ EPCOS
Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank- make L&T/EPCOS/Standard
Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank- make L&T/EPCOS/Standard
Supply of Push buttons for replacement of defective push buttons to switch ON and OFF capacitor banks in manual mode make- FTC/Standard/ L&T
Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make- standard/ L&T
Installation of all above components in the existing capacitor bank with suitable fabrication work to accommodate new items in the existing enclosure/ structure for alignment of components and ease to termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protections from moisture etc. as required at site.
Servicing of APFC Panels including complete dusting of the panel, cleaning of contact points, Decarbonizing of joints alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site.
Testing & commissioning of complete APFC Panel Installation including following: - 01. Meagering of complete capacitor installation using 500 V megger 02. Continuity test for checking continuity of all circuits to ensure that all circuits are properly wired. 03. Checking function and efficiency of various components of APFC Panel.
RENOVATION OF FIXED CAPACITORS BANKS OF TRANSFORMER :-01 No. Dismantling of defective capacitors units form the existing structures of capacitors bank of individual motor after suitably discharging the left-over charge on capacitors to ensure safety of the working persons, including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in existing system as required at site.
Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable and entry, mounting structure and hardware etc. make standard
Banking of capacitors of various capacities with multistrand copper wires & lugs/ aluminium bus bars and mounting arrangement for parallel connection to from suitable rating capacitor bank.
Power wiring with 10 sq. mm multistrand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc as required at site.
Installation of all above components in the existing capacitor bank with suitable fabrication work to accommodate new items in the existing enclosure/ structure for alignment of components and ease to termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protections from moisture etc. as required at site.
Servicing & commissioning of static capacitor banks including complete dusting, tightening of all connections, cleaning of electrical terminations megger testing and re-commissioning of capacitor banks.
Rebate of Old Scrap
STANDARD CAPACITORS (BID ID -1639960)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_371164.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .