| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.2 LAccepted-AOC | ₹11.2 L | 1 | Accepted-AOC Pass |
| 2 | 2₹11.2 LRejected-Finance | ₹11.2 L | 2 | Rejected-Finance L2 |
Tender Value
₹11.3 L
EMD Value
₹23,000
Closing Date
25 Apr 2026, 12:00 pmClosed
EE RED Etawah
EE RED Etawah
Janpad Etawah Kachchari me Advocate avm Aam Janta Bethne hetu Sarvjanik Veramdah Nirman Karya
2026_REDUP_1135657_1
1231/RED/Account/Tender Notice Dt 25.03.2026
Open Tender
Civil Works
90 days
Etawah
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹23,000
22 Jun 2026
10 Apr 2026
25 Apr 2026
10 Apr 2026
25 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1 | 1 | Cum | - | - |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Under Floor) as per SI.No. 2.25 (a) | - | cum | - | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. as per SI no 2.27 | - | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per SI no. 4.1.8 | - | cum | - | - |
| 5 | Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) as per SI No- 6.1.2 | - | cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) as SI No-5.1.2 | 1 | cum | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Upto Plinth Lvl as SI No-5.1.2 | - | cum | - | - |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Above Plinth Lvl as SI No-5.2.2 | - | cum | - | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Upto Plinth Lvl as SI No-5.1.2 | - | cum | - | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). Above Plinth Lvl | - | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2120380.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid