| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.2 L+₹7,737.46 (3.60%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.3 L+₹10,628.56 (4.94%)Rejected-AOC 1350 B SHYAM LAL BAGH NEAR NAND CINEMA HISAR 125001 | HISAR | HARYANA | 125001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹2.3 L+₹16,701.99 (7.77%)Rejected-AOC 161 SHIVPUR DIH SAKHWANIA SHAUKAT CHAURAHA KUSHINAGAR UTTAR PRADESH 274402 | KUSHI NAGAR | UTTAR PRADESH | 274402 | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Pawan Kumar L3 | The Star Builders Co-op L&C Society L1 | STAR ENTERPRISES L4 | Dinesh Hooda L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | [11.57]Providing and laying average 6mm thick POP Coating on walls, Ceiling, beams and lintels etc. complete in all respects as approved by the Engineer-In-Charge. [Through Rate] | 61.32 | Sqm | 76 ₹4,660.32 | 74 ₹4,537.68 Lowest | 78 ₹4,782.96 | 76 ₹4,660.32 |
| 2.00 | [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate] | 219.06 | Sqm | 36 ₹7,886.16 | 35 ₹7,667.1 Lowest | 36 ₹7,886.16 | 36 ₹7,886.16 |
| 3.00 | [11.87.1]French spirit polishing : 1. Two or more coats on new works including a coat of wood filler [Through Rate] | 416.24 | Sqm | 162 ₹67,430.88 | 159 ₹66,182.16 Lowest | 166 ₹69,095.84 | 159 ₹66,182.16 Lowest |
| 4.00 | [30.22]Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. [Through Rate] | 219.06 | Sqm | 12 ₹2,628.72 | 11 ₹2,409.66 Lowest | 13 ₹2,847.78 | 11 ₹2,409.66 Lowest |
| 5.00 | [30.28.1]Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 1. One or more coats on old work [Through Rate] | 355.83 | Sqm | 47 ₹16,724.01 | 41 ₹14,589.03 Lowest | 48 ₹17,079.84 | 43 ₹15,300.69 |
| 6.00 | [30.34.1]Distempering with 1st quality acrylic distemper (ready made) having VOC content less than 50 gm per litre. of approved manufacturer and of required shade and colour complete. as per manufacturer`s specification. 1. One or more coats on old work [Through Rate] | 1,887.1 | Sqm | 24 ₹45,290.4 | 23 ₹43,403.3 Lowest | 25 ₹47,177.5 | 24 ₹45,290.4 |
| 7.00 | [30.37.2]Finishing walls with Acrylic Smooth exterior paint of required shade : 2. Old work (One or more coat applied @ 0.90 litre/10 sqm). [Through Rate] | 1,455.92 | Sqm | 45 ₹65,516.4 | 42 ₹61,148.64 Lowest | 46 ₹66,972.32 | 45 ₹65,516.4 |
| 8.00 | [9.53]Extra for sunk or raised mouldings in the plaster of Paris (Gypsum anhydrous) ceiling. [Through Rate] | 61.32 | Sqm | 252 ₹15,452.64 | 245 ₹15,023.4 Lowest | 258 ₹15,820.56 | 252 ₹15,452.64 |
Tender Value
₹2.0 L
EMD Value
₹3,980
Closing Date
4 Sept 2025, 3:00 pmClosed
JAGDISH SINGH DAHIYA
ENGG.CELL, MDU, ROHTAK
Re-Invite-Distempering, painting, polishing and exterior paint in V.C.Residence in MDU Rohtak
2025_HRY_466685_1
20255E22B142 476D 4305 983C DE808F2824B7817MDU
Open Tender
Civil Works
Works
60 days
Rohtak
Re-Invite-Distempering, painting, polishing and exterior paint in V.C.Residence in MDU Rohtak
2 documents required · 2 mandatory
₹500
₹3,980
Yes
5 Dec 2025
21 Aug 2025
5 Sept 2025
21 Aug 2025
4 Sept 2025
21 Aug 2025
21 Aug 2025 - 23 Aug 2025
Amount
[11.57]Providing and laying average 6mm thick POP Coating on walls, Ceiling, beams and lintels etc. complete in all respects as approved by the Engineer-In-Charge. [Through Rate]
[11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate]
[11.87.1]French spirit polishing : 1. Two or more coats on new works including a coat of wood filler [Through Rate]
[30.22]Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. [Through Rate]
[30.28.1]Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 1. One or more coats on old work [Through Rate]
[30.34.1]Distempering with 1st quality acrylic distemper (ready made) having VOC content less than 50 gm per litre. of approved manufacturer and of required shade and colour complete. as per manufacturer`s specification. 1. One or more coats on old work [Through Rate]
[30.37.2]Finishing walls with Acrylic Smooth exterior paint of required shade : 2. Old work (One or more coat applied @ 0.90 litre/10 sqm). [Through Rate]
[9.53]Extra for sunk or raised mouldings in the plaster of Paris (Gypsum anhydrous) ceiling. [Through Rate]
Dinesh Hooda (BID ID -1326852)
Pawan Kumar (BID ID -1328603)
STAR ENTERPRISES (BID ID -1328760)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .