Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance MARAR RANCHI ROAD DISTT RAMGARH JHARKHAND | RAMGARH | JHARKHAND | L1 | Accepted-Finance SINCE L1 | |
| 2 | L2₹1.7 L+₹1,514 (0.92%)Rejected-Finance MARAR RANCHI ROAD DIST RAMGARH JHARKHAND 829117 | MARAR | RAMGARH | JHARKHAND | 829117 | L2 | Rejected-Finance SINCE L2 | |
| 3 | L3₹1.7 L+₹2,380 (1.44%)Rejected-Finance MOHAMMAD IMTIYAZ CHITARPUR RAMGARH 825101 JHARKHAND INDIA | CHITARPUR | RAMGARH | JHARKHAND | 825101 | L3 | Rejected-Finance SINCE L3 |
| Sl No | Description | Qty | Unit | M/S SONY ENGINEERING &ELECTRICAL WORKS L3 | M/S BHARAT MOTORS L1 | M/S NATIONAL ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 2.00 | Fuel pump complete overhauling with changing of element DV, repairing kit and setting etc. | 1 | job | 20,560 ₹20,560 | 20,500 ₹20,500 Lowest | 20,550 ₹20,550 |
| 3.00 | Nozzle complete overhauling with changing of element , washer and pump setting. | 4 | nos | 4,060 ₹16,240 | 4,000 ₹16,000 Lowest | 4,050 ₹16,200 |
| 4.00 | Air Filter(Inner and Outer) | 1 | set | 4,900 ₹4,900 | 4,800 ₹4,800 Lowest | 4,850 ₹4,850 |
| 5.00 | Replacement of Flywheel complete Assembly | 1 | nos | 18,500 ₹18,500 | 18,400 ₹18,400 Lowest | 18,450 ₹18,450 |
| 6.00 | Replacement of Flywheel gutka Bush | 26 | nos | 222 ₹5,772 | 218 ₹5,668 Lowest | 220 ₹5,720 |
| 7.00 | Solenoid valve assembly | 1 | nos | 3,900 ₹3,900 | 3,800 ₹3,800 Lowest | 3,850 ₹3,850 |
| 8.00 | Mobil and diesel filter set | 1 | set | 2,000 ₹2,000 | 1,900 ₹1,900 Lowest | 1,950 ₹1,950 |
| 9.00 | Flywheel; bolt changing | 24 | nos | 76 ₹1,824 | 72 ₹1,728 Lowest | 75 ₹1,800 |
| 10.00 | AVR Complete | 1 | set | 15,300 ₹15,300 | 15,200 ₹15,200 Lowest | 15,250 ₹15,250 |
| 11.00 | Exhaust cylinder with pipe | 1 | nos | 8,200 ₹8,200 | 8,100 ₹8,100 Lowest | 8,150 ₹8,150 |
Tender Value
Refer Docs
EMD Value
₹2,400
Closing Date
14 Jul 2023, 6:55 pmClosed
PE(EnM)
KARMA PROJECT OFFICE
Repairing Head ,Fuel pump,Nozzle,Air filter and flywheel assembly of 125 KVA DG Set set Ruston make of Karma project under Kuju Area.
2023_CCL_282790_1
P.E/EnM/Karma/eTender/23-24/23
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
KARMA PROJECT
2 documents required · 2 mandatory
₹2,400
27 Aug 2025
3 Jul 2023
15 Jul 2023
4 Jul 2023
14 Jul 2023
4 Jul 2023
3 Jul 2023 - 8 Jul 2023
Amount
Fuel pump complete overhauling with changing of element DV, repairing kit and setting etc.
Nozzle complete overhauling with changing of element , washer and pump setting.
Air Filter(Inner and Outer)
Replacement of Flywheel complete Assembly
Replacement of Flywheel gutka Bush
Solenoid valve assembly
Mobil and diesel filter set
Flywheel; bolt changing
AVR Complete
Exhaust cylinder with pipe
Water cooling and outlet pipe
Nozzle pipe
Fuel pipe
Water Temp. Gauge
Mounting bracket
Exterior Rotor assembly
Head repairing, sheet changing,valve 7 Guide replacing etc.
Hose pipe 2 1/2'' x9 ''
Hose cap
Labour charge
skilled manpower 02 nos x 03 days
Unskilled manpower 02 nos x 03 days
Supervisor 01nos x 03 days
Total impact of GST for the purpose of CTC
M/S NATIONAL ENTERPRISES
M/S SONY ENGINEERING &ELECTRICAL WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .