SE EWC Gorakhpur
Srirampuram Colony Mohaddipur Gorakhpur.
Line Shifting Work Gorakhnath Over Bridge to Hariyali Lawn Mod Gorakhpur
2024_PVVNV_931192_1
01/EWC(G)/2024-25
Open Tender
Electrical Works
Item Wise
30 days
gorakhnath
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EWC Gorakhpur
₹4,000
Yes
31 Jul 2024
20 Jun 2024
6 Jul 2024
20 Jun 2024
5 Jul 2024
20 Jun 2024
Amount
Shifting of Existing distribution Transformer from Gorakhnath bridge, Gorakhpur to Hariyali lawn Moad Gorakhpur (Via Ramlila maidan) Under the head of Deposit Scheme 2024-25. Part A (Materials Provided by contractor)
ST Pole 11 m long
1x400 mm² LT Cable
Bolts, Nuts, & Washers
Earthing Complete (MS Earthing Rod 20x2500 mm+GI wire 5mm 2 Kg per)
Al. Paint
Red oxide Paint
11 KV Polymer Pin Insulator
11 KV E bracket with nut bolt for ST Pole with nut bolt by 50x6 mm MS flat Iron make
11 KV Polymer Disc Insulator
11 KV Polymer Disc fitting
11 KV Stay set (Stay Rod 16x1800 mm, Stay wire 7/10 SWG -5Kg/Stay, Stay clamp)
11 KV MS channel Dropper for fuse set(100x50x2028)
Clamp for LT T-Off
11 KV holding clamp for fuse set/TPMO etc
11 KV MS angle (T/F Base) (75x75x6x2028 MM)
11 KV MS channel Dropper (125x65x2240 MM)
11 KV MS channel T-Off(125x65x1300mm)
11 KV TPMO
Copper L- Piece 62x225x12mm (LS)
4 Core LT MCB with box (LS)
Al. lug 400 sqmm
Part B Work
Shifting, loading, Carriage and re-installation of Existing 400/250 kVA T/F From Existing place to Shifting Place, cartage & erection of all materials related to D/P, laying and connection of LT cable with transformer, installation of jaali (FRP fencing) and Earthing of Transformer at two place).
Disconnection & reconnection of all related jumper
Temporary shifting of Transformer on trolley by opening all HT & LT connetion & Jumper and reconnect the same from trolley with all required materials for temporary shifting (temporary trolley will be provided by contractor)
ARK ENGINEERING
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .