Superintending Engineer- HQ,OTPS, OBRA
Office of Superintending Engineer-HQ,OTPS,OBRA
Work for laying of fire hydrant line ,100 mm dia150mm dia and 200mm dia to boost up water press., from pump house to admin building and central store ATPS, Obra
2024_RVUNL_949627_1
OBR/SE-HQ/FFSD//6000006067_00
Open Tender
Miscellaneous Works
Fixed-rate
75 days
OBRA THERMAL POWER STATION OBRA, SONEBHADRA
as per tender documents
3 documents required · 3 mandatory
₹590
UPRVUNLTD P AND AD BTPS OBRA
₹9,000
18 Sept 2024
27 Aug 2024
5 Sept 2024
27 Aug 2024
3 Sept 2024
27 Aug 2024
27 Aug 2024 - 3 Sept 2024
Amount
Laying of MS Pipe line pump house (5x50MW) to Admin building & central store
Laying of MS pipe of hydrant system including cutting, and welding etc. & commissioning the line at 8 to 10Kg./Cm2
100 mm dia.
150 mm dia.
200 mm dia.
Making of MS bend, tee, and reducer including cutting welding work of following size pipes
100 mm dia.
150mm dia.
200 mm dia.
Fixing of MS bend, tee, and reducer of following sizes pipe.
100 mm dia.
150mm dia.
200 mm dia.
Fixing of MS Flange on the hydrant system/pipe line by cutting, welding and grinding etc. of following dia Size.
100mm dia.
150mm dia.
200mm dia.
Dismantling of CI gate valve of following sizes with the help of nuts and bolts.
100 mm dia.
150mm dia.
200mm dia.
Fixing of CI gate valve of following sizes with the help of nuts and bolts.
100 mm dia.
150mm dia.
200mm dia.
Dismantling of MS/CI/GI pipe line from the hydrant system by loosening of nuts and bolts by cutting and transportation of following sizes.
80 mm dia.
100 mm dia.
150mm dia.
200mm dia.
Fabrication of hydrant valve post of MS pipe dia. 80mm one Mtrs. Long and welding with MS Flange 80mm dia. It should be painted with Red Oxide and finally with Red paint.
Fixing of hydrant post of 80mm pipe line of hydrant system with the help of nut and bolts by welding works including dismantling of damage post which is to be shifted at site store.
Dismantling of RCC/CC metallic road for taking out the damaged pipe for replacement of pipe and filling the same up to proper level of the earth.
Earth work by excavation of ordinary/mixed soil/mixed with bujari, bolders etc. with lifting up to 1.5 - 2.0 Mtrs. Including/watering/ hammering of executed soil.
Painting of 200,150 & 100mm dia. fire hydrant lines including one coat Red Oxide and two coats of Orange Red colour paint after preparing the base by removing and cleaning of pipe line surface .
Making and fixing of pipe stand for supporting and clamping 150mm dia MS pipe by cutting/welding nut & bolts with grouting (RCC Work) etc. Note:- Boiler tubes, pipes/angle/channel for support of clamp should be taken from scrap yard/SD.
M/S DURGA ENGINEERING WORKS
INDIA ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .