Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Admitted |
| 2 | Accepted-Technical | Accepted-Technical Admitted |
| 3 | Accepted-Technical | Accepted-Technical Admitted |
| 4 | Accepted-Technical STAKMO | Accepted-Technical Admitted |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
21 Mar 2026, 4:00 pmClosed
Executive Engineer Igoo Phey Division Leh
Executive Engineer Igoo Phey Division Leh
Running and Maintance of Igo Phey Canal By way of Engagement of Seasonal Labour Removal of silt and alined works for the year 2026 2027 Under MandR
2026_PWD_18617_1
E-Tender 31 of IPD Leh of 2025-26
Open Tender
Civil Works - Others
365 days
leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Igoo Phey Division Leh
₹70,000
23 Mar 2026
14 Mar 2026
23 Mar 2026
14 Mar 2026
21 Mar 2026
14 Mar 2026
Engagement of Labour for the adjustment of Gate valves and to watch and ward of igo phey canal.
Making Knitted wire crate of approved mesh size including weaving bindingsides and partions and binding top after filling excluding cost of filling stones and weaving materials.
Supply of crates mesh BA wire 4mm diaof 4"x4" mesh with lead of size 16 x 20 @ 0.185 Kg/Sft including carriage complete Job.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) wet
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form Foundations, footings, bases of columns, etc. for mass concrete
Dumping stone including cost of stone in horizantal level.
Weed clearance From canals(including extraction of roots)
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Providing and fixing of winch box of gate system with all necessary rods handles allied repair works to operate the hydrulic gate at different location complete job including carriage upto site work .
Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Carriage of materials from source to site of work. Cement avg. lead 15 km.
Sand avg. lead 15 km.
Aggregrate avg. lead 15 km.
Stone 15 km
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_44635.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid