Loading…
Loading…
Tender Value
₹40.1 L
EMD Value
₹80,300
Closing Date
17 Aug 2026, 12:00 pmClosed
Executive Officer
MUNCIPAL BOARD BRIJNAGAR
sundarvaili road sthit nagarpalika bhumi par agnishaman kendra nirman karya
2026_DLB_587244_1
ENIT21
Open Tender
Civil Works
Percentage
MUNCIPAL BOARD BRIJNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Officer
₹80,300
Yes
17 Aug 2026
13 Aug 2026
17 Aug 2026
13 Aug 2026
17 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m Add extra for overall depth of excavation above 1.5 m and upto 3.0 m over item no 4.10.1.1 | 0.2 | CUM | 246.6 | ₹49.32 |
| 1.02 | Earth work in excavation in soil unsuitable for road construction such as marshy soil including pumping out water, removal of the same and disposal with all lift and lead upto 1 km as per MoRT&H specification clause 301. | - | CUM | 214.5 | - |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | CUM | 4,575 | ₹4,570.43 |
| 1.04 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | CUM | 4,860 | ₹4,855.14 |
| 1.05 | Random rubble dry stone Kharanja (soling) under floor. | 1 | CUM | 2,270 | ₹2,267.73 |
| 2 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 0.8 | SQM | 426 | ₹340.37 |
| 3 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | SQM | 375 | ₹374.63 |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 1 | SQM | 236.5 | ₹236.26 |
| 5 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. | 0.2 | SQM | 456 | ₹91.2 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | CUM | 7,380 | ₹7,372.62 |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_1042984.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .