Loading…
Loading…
Tender Value
₹6.4 L
EMD Value
₹13,000
Closing Date
6 Oct 2026, 11:00 am
eo
np sumerpur
ward 03 05 11 14 16 17 me nali crass interlocing ka nirman kary
2026_DOLBU_1189866_1
583 date 23.09.2026/01
Open Tender
Civil Works
Percentage
np sumerpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
eo
₹13,000
Yes
26 Sept 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clearnce and other unseen item | 1 | LS | 1,500 | ₹1,500 |
| 2 | Pthotgraphy work | 1 | Job | 1,500 | ₹1,500 |
| 3 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. | 49.5 | Cum. | 120 | ₹5,940 |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. | 21 | Cum. | 1,000 | ₹21,000 |
| 5 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8 : 4 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | 25 | Cum. | 4,300 | ₹1,07,500 |
| 6 | Class-150 brick work in 1:4cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. | 44 | Cum. | 5,300 | ₹2,33,200 |
| 7 | Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | 2.4 | Cum. | 5,600 | ₹13,440 |
| 8 | 12mm thick plaster with cement and fine sand in 1:4 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I.No. 584) | 490 | SQM | 130 | ₹63,700 |
| 9 | RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. S.I. No.-288 (As in item (283) above but in RCC T-beam and slab roof in 1.1.5.3) | 11 | Cum. | 6,400 | ₹70,400 |
| 10 | Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. SI No. 504 | 10.5 | Qtl. | 5,600 | ₹58,800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_2242167.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .