Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VIRALIKATTUVILAI MEKKAMANDAPAM P O K K DISTRICT | K K DISTRICT | TAMIL NADU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,669
Closing Date
15 Feb 2023, 2:00 pmClosed
EE/TKY
TNEB TKY
1 EosIII B Addl load SC to Tmy Ahilandeswari at peyankuzhi by providing 250 Kva Under parasery section 2IMP esti for strengthening of conductor for 7 3 35 into 7 4 09 ACSR conductor Anna statue to colachel Junction various works various section
2023_EB_285105_1
EE/D/TKY/ETW 14/Dt.31.01.2023
Open Tender
Electrical Works
Works
90 days
o/o EE/D/TKY
As specified Tender
3 documents required · 3 mandatory
₹0
₹3,669
17 Feb 2023
31 Jan 2023
16 Feb 2023
1 Feb 2023
15 Feb 2023
1 Feb 2023
1 Feb 2023 - 15 Feb 2023
Electrical works
Loading & Unloading of PSC pole above 8.00 m length
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM(500 upto 2KM) (9,8 mtr psc poles )
Excavation of pole pit For pole above 8.00 m length by using JCB
Erection of PSC poles above 8.00m length by using crane
Loading & Unloading of PSC pole upto 8.00 m length JCB
Excavation of pole pit For pole upto 8.00 m length by using JCB
Erection of PSC poles upto 8.00m length by using crane
Erection of TI Fittings HT
Erection of V X arm 4,1/2 Ft
Drilling of Slotted Holes
Fixing of LT Three phase X arm
Fixing of LT single phase X arm
Loading / Unloading of line materials
For ordinary tree clearance and Throng bushes & trees.
For cocount tree clearance and Throng bushes & trees.
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)
Dismantling of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)
Fixing of HT PIN insulator with Pin 11 kv
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Dismantling & Redoing of Single Phase Sc wire
Dismantling of 8 mtr PSC pole sizes including the closing of the pit
Fixing of LT shackle
Dismantling &Fixing of LT shackle
Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..
Dismantling of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..
Loading / Unloading of (ii) Above 100 KVA and upto 500 KVA (250 Kva)
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.(ii) Above 100 KVA to 250 KVA(250Kva)
Dismantling &Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Fixing of LT PIN insulator
Dismantling &Erection of Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor(LT)
Erection of Paving and stringing of conductors of sizes upto 7/3.35 mm ACSR or other equivalent conductor
Dismantling of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.(iii) Above 100 KVA to 250 KVA(100kva)
Loading / Unloading of (ii) Above 100 KVA and upto 500 KVA
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.(iii) Above 100 KVA to 250 KVA (250Kva)
Dismantling &Erection of TI Fittings HT
Dismantling &Erection of V X arm 3,1/2 Ft
Dismantling &Fixing of LT Three phase X arm
Dismantling &Fixing of LT single phase X arm
Dismantling &Fixing of HT PIN insulator with Pin 11 kv
Dismantling & Redoing of three Phase Sc wire
Dismantling of 9 mtr PSC pole sizes including the closing of the pit
Dismantling &Fixing of LT PIN insulator
Erection of Paving and stringing of conductors of sizes upto 7/4.09 mm ACSR or other equivalent conductor
Dismantling of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Dismantling &ReErection of 1*40 W Tube light in complete set
Dismantling &Erection of street light switch control box with switching arrangement &wiring etc(Excluding the cost of wire)
Dismantling of conductors of sizes upto 7/3.35 mm ACSR or other equivalent conductor
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II) (Without Str pole 2nos 9 mtr pole)
Dismantling of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II) (Without Str pole 2nos 9 mtr pole)
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .