| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 CrAccepted-AOC NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹4.4 Cr | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹4.6 CrRejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹4.6 Cr | 2 | Rejected-Finance 2ND LOWEST |
| Sl No | Description | Qty | Unit | ARVIND KUMAR SINGH L2 | M/S UNITE ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting. With proper disposal. | 6,930 | Sqm | 5.55 ₹38,461.50 | 5.45 ₹37,768.50 |
| 2.00 | Earth work for restoration of damaged internal slope by silt from canal bed including excavation,mechanical compaction and dressing to specified profile including all lead and lift as directed and specified. | 22,977 | Cum | 155 ₹35.6 L | 145 ₹33.3 L |
| 3.00 | Earth work for restoration of damaged internal slope and daula by power transport for a lead of up to 3 k.m. including excavation, loading, unloading,manual compaction and dressing including all lift | 1,099 | Cum | 250.15 ₹2.7 L | 245.1 ₹2.7 L |
| 4.00 | Supply and laying of sandy earth/ sand filled E.C. bages including all cost of earth , empty bags, labour, stiching with sutely complete, laying and placing in position complete. | 38,657 | Nos | 22.5 ₹8.7 L | 18.4 ₹7.1 L |
| 5.00 | Dewatering of water by 5 H.P. Diesel Pump including suction & delivery pipe, operator and P.O.L. with all labour ,T&P etc. required for proper complition of work. | 1,833 | Hours | 197.1 ₹3.6 L | 195 ₹3.6 L |
| 6.00 | Earth work in excavation for foundation of toe wall and sleeper etc. including lead up to 30 m & lift upto 1.5 m excluding mechanical compaction but including manual compaction and dressing to profile. | 5,300.94 | Cum | 110.5 ₹5.9 L | 115 ₹6.1 L |
| 7.00 | Centering and Shuttering for CC Work including rent of shuttering , material, labour and T&P required for proper completion of work. | 1,532.52 | Sqm | 651.5 ₹10.0 L | 645 ₹9.9 L |
| 8.00 | Laying Cement Concrete in foundation 1:3:6 (M-10) with 20 mm crushed stone grit including cost of material, labour, T&p etc, complete. | 117.77 | Cum | 8,250.5 ₹9.7 L | 8,450.1 ₹10.0 L |
| 9.00 | RR Stone masonry work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. | 445.5 | Cum | 7,945.1 ₹35.4 L | 7,850 ₹35.0 L |
| 10.00 | Supplying & laying 75 mm thick Local sand river/silt from canal bed as subbase material below the lining. | 908.86 | Cum | 120.1 ₹1.1 L | 115 ₹1.0 L |
Tender Value
₹4.7 Cr
EMD Value
₹9.3 L
Closing Date
13 Oct 2025, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT06
2025_UPIDC_1080571_6
07/SE-XII/2025-26
Open Tender
Civil Works
240 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,206
₹9.3 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
9 Apr 2026
7 Oct 2025
13 Oct 2025
7 Oct 2025
13 Oct 2025
7 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
techsummary_1977276.pdf
BOQ Comparative Chart
xlsx
finsummary_1977276.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1977276.xls
BOQ • 0.28 MB
TD6.pdf
Tender Documents • 2.22 MB
Download all tender documents and submit your bid