Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 CrAccepted-AOC NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹4.4 Cr | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹4.6 CrRejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹4.6 Cr | 2 | Rejected-Finance 2ND LOWEST |
| Sl No | Description | Qty | Unit | ARVIND KUMAR SINGH L2 | M/S UNITE ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting. With proper disposal. | 6,930 | Sqm | 5.55 ₹38,461.5 | 5.45 ₹37,768.5 Lowest |
| 2.00 | Earth work for restoration of damaged internal slope by silt from canal bed including excavation,mechanical compaction and dressing to specified profile including all lead and lift as directed and specified. | 22,977 | Cum | 155 ₹35,61,435 | 145 ₹33,31,665 Lowest |
| 3.00 | Earth work for restoration of damaged internal slope and daula by power transport for a lead of up to 3 k.m. including excavation, loading, unloading,manual compaction and dressing including all lift | 1,099 | Cum | 250.15 ₹2,74,914.85 | 245.1 ₹2,69,364.9 Lowest |
| 4.00 | Supply and laying of sandy earth/ sand filled E.C. bages including all cost of earth , empty bags, labour, stiching with sutely complete, laying and placing in position complete. | 38,657 | Nos | 22.5 ₹8,69,782.5 | 18.4 ₹7,11,288.8 Lowest |
| 5.00 | Dewatering of water by 5 H.P. Diesel Pump including suction & delivery pipe, operator and P.O.L. with all labour ,T&P etc. required for proper complition of work. | 1,833 | Hours | 197.1 ₹3,61,284.3 | 195 ₹3,57,435 Lowest |
| 6.00 | Earth work in excavation for foundation of toe wall and sleeper etc. including lead up to 30 m & lift upto 1.5 m excluding mechanical compaction but including manual compaction and dressing to profile. | 5,300.94 | Cum | 110.5 ₹5,85,753.87 Lowest | 115 ₹6,09,608.1 |
| 7.00 | Centering and Shuttering for CC Work including rent of shuttering , material, labour and T&P required for proper completion of work. | 1,532.52 | Sqm | 651.5 ₹9,98,436.78 | 645 ₹9,88,475.4 Lowest |
| 8.00 | Laying Cement Concrete in foundation 1:3:6 (M-10) with 20 mm crushed stone grit including cost of material, labour, T&p etc, complete. | 117.77 | Cum | 8,250.5 ₹9,71,661.38 Lowest | 8,450.1 ₹9,95,168.28 |
| 9.00 | RR Stone masonry work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. | 445.5 | Cum | 7,945.1 ₹35,39,542.05 | 7,850 ₹34,97,175 Lowest |
| 10.00 | Supplying & laying 75 mm thick Local sand river/silt from canal bed as subbase material below the lining. | 908.86 | Cum | 120.1 ₹1,09,154.09 | 115 ₹1,04,518.9 Lowest |
Tender Value
₹4.7 Cr
EMD Value
₹9.3 L
Closing Date
13 Oct 2025, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT06
2025_UPIDC_1080571_6
07/SE-XII/2025-26
Open Tender
Civil Works
Fixed-rate
240 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,206
₹9.3 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
9 Apr 2026
7 Oct 2025
13 Oct 2025
7 Oct 2025
13 Oct 2025
7 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
techsummary_1977276.pdf
BOQ Comparative Chart
xlsx
finsummary_1977276.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1977276.xls
BOQ • 0.28 MB
TD6.pdf
Tender Documents • 2.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].