| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹2.5 Cr | L1 | Accepted-AOC technically qualified and quoted lowest amount |
| 2 | L2₹2.5 Cr+₹1.7 L (0.65%)Rejected-Finance 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | ₹2.5 Cr+₹1.7 L (0.65%) | L2 | Rejected-Finance quoted higher rate than L1 |
| 3 | L3₹2.6 Cr+₹5.5 L (2.19%)Rejected-Finance 35 8 5 RAMPUR GARDEN AMAN TRADERS 35 8 5 RAMPUR GARDEN NEAR L I C BUILDING BAREILLY UTTAR PRADESH BAREILLY BAREILLY UTTAR PRADESH 243001 UDYAM UP 15 0002258 09EUPPS2879C1ZW B R | BAREILLY | UTTAR PRADESH | 243001 | ₹2.6 Cr+₹5.5 L (2.19%) | L3 | Rejected-Finance quoted higher rate than L1 |
| 4 | L4₹2.6 Cr+₹6.6 L (2.60%)Rejected-Finance 692 BAHRA SAUDAGAR NABI PURWA HARDOI UTTAR PRADESH | HARDOI | HARDOI | UTTAR PRADESH | ₹2.6 Cr+₹6.6 L (2.60%) | L4 | Rejected-Finance quoted higher rate than L1 |
Tender Value
₹2.9 Cr
EMD Value
₹5.9 L
Closing Date
19 Nov 2024, 3:00 pmClosed
SE Sixth Circle IW Lucknow
Office of SE six circle Lucknow
Janpad Hardoi me Parchal escape pr nirmit kshatigrasht pakki sanrachnao ke punarnirman ka karya
2024_UPIDC_958266_3
03/SE-6/2024-25 LOT5
Open Tender
Civil Works - Canal
Item Rate
180 days
HARDOI
please refer to tender documents
4 documents required · 4 mandatory
₹2,354
₹5.9 L
Yes
4 Apr 2025
13 Nov 2024
19 Nov 2024
13 Nov 2024
19 Nov 2024
13 Nov 2024
Amount
E/W in Making Road diversion & Bund in Escape by any means lead up to 30 M & lift upto 1.5 M manual compaction and dressing etc.All Work done as per direction of Engineer-in-charge. For vrb at Km 0.740, 3.467, 8.225
Demolishing RCC Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead. All Work done as per direction of Engineer-in-charge. For vrb at km 8.225
Demolishing Lime concrete Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead .All Work done as per direction of Engineer-in-charge. For vrb at km 3.467, 8.225
Demolishing brick work in Lime mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge For vrb at km 3.467
Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. For vrb at km 8.225 and inlet no,1 and inlet no 2
Earth work in strengthinig Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and inlet no 1
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete.All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. (Cement- Ultratech/ A.C.C / J.k super /Birla ) All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225,
Laying Plain Cement Concrete (M -10) in foundation 1:3:6 with stone grie including cost of material, labour, T&p etc, complete.(Cement-Ultratech/ A.C.C / J.k super /Birla )All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
Laying Reinforced Cement Concrete ( M25 ) in Raft , Abetment , Piers, slab etc. in with Superplasticizer (Admixture) using Cement (Ultratech/ A.C.C / J.k super /Birla (43 grade)) with Coarse Sand & 10 mm - 20mm Kabrai stone Aggregate by using batching plant transit mixer & Concrete pump including cost of all material, labour, T&p etc, complete. All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
Bending,Binding,Cutting and Placing in position reinforcement ( TATA / SAIL / JSW ) including all cost of labour and material T&P etc. required for porper completion of the work/MT. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, Km stone, cb stone
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225, bed bar, Km stone, cb stone
Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. (Ultratech/ A.C.C / J.k super /Birla) All Work done as per direction of Engineer-in-charge.For vrb at km 0.740, 3.467, 8.225 and inlet no1 and inlet no2
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. as per drawing. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Providing & Fixing Bitumen Joint filer Board For Expansion Joints. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
12 mm Cement Plaster in 1:3 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard) All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and inlet no1 and inlet no2
Dry brick on end pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Dry brick on Edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Supplying & Laying 500 GSM Non-woven geotextile made of 100 % Polypropylene staple fibre (continuous filament not allowed) bonded into stable network through needlepunching meeting the technical specifications and qualification criteria in the tender. The geotextile should be Tech-geo PR 15 OR equivalant and have minimum 70% resistance against UV exposure and should be inert to biological degradation and resistant to naturally ocurring acids and alkalies. including contractor's profit. All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Supply and laying of stone boulder (Kabrai cut stone 40-60 Kg) with proper packing .All Work done as per direction of Engineer-in-charge. For vrb at km 0.740, 3.467, 8.225 and boulder pitching
Making / Fixing of expansion joint as per Drawing & direction of engineer-in-charge. For vrb at km 0.740, 3.467, 8.225
Painting Chainage & Name of Canal on Km Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge. For Km stone
Painting Chainage / No. on Canal Boundary Stone / 200M Stone Including Cost of All Matreial Labour T&P etc. All Work done as per direction of Engineer-in-charge. For cb Stone
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. All Work done as per direction of Engineer-in-charge. For inlet no 1 and inlet no 2
Earth work in Remodelin of escape section for boulder pitching with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles. All Work done as per direction of Engineer-in-charge. For boulder pitching
Making sub grade in linning work including watering, compaction and preparation of surface. All Work done as per direction of Engineer-in-charge. For boulder pitching
Supplying & Layin 500 GSM Non-woven geotextile made of 100 % Polypropylene staple fibre (continuous filament not allowed) bonded into stable network through needlepunching meeting the technical specifications and qualification criteria in the tender. The geotextile should be Tech-geo PR 15 OR equivalant and have minimum 70% resistance against UV exposure and should be inert to biological degradation and resistant to naturally ocurring acids and alkalies. including contractor's profit. All Work done as per direction of Engineer-in-charge. For boulder pitching
Supply and laying of stone boulder (Kabrai cut stone 40-60 Kg) with proper packing in 8mm SWG GI Wire Crate Size 1.50x1.50x0.50M mesh Size 0.15x0.15 M including All Cost of Labour material T&P etc. All Work done as per direction of Engineer-in-charge. For boulder pitching
M/S ASHISH KUMAR (BID ID -4718702)
M/s Aman Traders (BID ID -4720789)
NIRBHAY KUMAR MISHRA (BID ID -4730796)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .