Tender Value
₹21.1 L
EMD Value
₹48,300
Closing Date
25 May 2026, 3:00 pmClosed
Exe. Eng. Minor Irrigation Division, Latehar
Exe. Eng. Minor Irrigation Division, Latehar
Renovation of Kena MI Scheme Block Latehar Distt Latehar
2026_WRD_114027_1
WRD/MID/Latehar/F2-02/2026-27 Dated12-05-2026
Open Tender
Civil Works
Percentage
335 days
Block Latehar Distt Latehar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹48,300
1 Jun 2026
15 May 2026
28 May 2026
15 May 2026
25 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance in borrow area , building premises,flanks and slopes of the roads,canals and embankments by removing the grass and the jungle bushes from top including weeding out shrubs,roots and levelling etc. complete as per direction of E/I.(Part - B-5.1.3.1,Patr - A-2.02) | - | Ha | 19,760.3 | - |
| 2 | E/w in stripping by hydraulic M/C in grade A & B type of soil including morroum soil, soil mixed with kankar, pebbles,boulders upto 300 mm size and disposal of the same along with all organic materials in the country side beyond 150 M upto 500 M in all by tipper including construction & maintenance of haul road etc. complete as per specification and direction of E/I.(5.1.6.1) | 288.19 | M3 | 88.35 | ₹25,461.41 |
| 3 | Earthwork in excavation and filling of canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 10 m with all lifts all complete as per s[ecification and direction of E/I. ( 7.1.43.1) | 1,471.5 | M3 | 50.53 | ₹74,354.9 |
| 4 | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 m with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. ( 7.1.43.2) | 2,207.25 | M3 | 105.09 | ₹2,31,959.9 |
| 5 | Extra for earth work in marshy, slushy and daldal soil (vide classification of soil item - F) all complete as per specification and direction of E/I. ( 7.1.11) | 367.88 | M3 | 28.64 | ₹10,536.08 |
| 6 | Use rate of 10 H.P. Diesel Pumpset including diesel, mobil, Operator etc all complete.(PM-29) | 100 | Hrs. | 344.85 | ₹34,485 |
| 7 | Supplying and laying sand filter on slope of the dam as per design, drawing, with watering and compaction including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. (5.6.5) | 132 | M3 | 1,415.17 | ₹1,86,802.44 |
| 8 | Supplying and laying Stone metal (20mm to 63mm) on the slope of dam -do- as per specification and direction of E/I. (WRD 5.6.7 ) | 125.4 | M3 | 2,103.59 | ₹2,63,790.19 |
| 9 | Supplying and laying (properly as per design and drawing) rip -rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage as per specification and direction of E/I. (5.6.8) | 1 | M3 | 1,756.4 | ₹1,754.64 |
| 10 | Supplying and laying boulders in rock toe, heel trenches of the dam as per design, drawing including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specificatins and direction of E/I.(Item No.5.6.4) | 36.48 | M3 | 1,491.06 | ₹54,393.87 |
stage.html
html • 0.03 MB
finance_154038.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.25 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
tendersdocumentsss.pdf
Tender Documents • 1.25 MB
BOQ_154038.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .