| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.7 LAccepted-AOC | ₹69.7 L Quoted ₹74.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹80.0 LRejected-AOC MADURAI | MADURAI | TAMIL NADU | 625001 | ₹80.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | HEADWAY CONSTRUCTION L2 | SRI BALAJII CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.01 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 95 | m3 | 106.2 ₹10,089 | 92.51 ₹8,788.45 |
| 2.01 | Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal stone aggregate to Wet Mix Macadam (WMM) specification including premix the materials with water at OMC in machanical mix plant carriage to mixed materials by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clause 406 of MORTH specifications. | 229 | m3 | 3,038.5 ₹7.0 L | 2,646 ₹6.1 L |
| 3.01 | Providing and laying Prime coat of 7.00kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev | 2,282 | m2 | 100.3 ₹2.3 L | 87.35 ₹2.0 L |
| 4.01 | Providing and laying tack coat of 2.50kgs/10 sqm over the prime surface treated with binter using 2.50 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 2,282 | m2 | 22.7 ₹51,801.40 | 19.74 ₹45,046.68 |
| 5.01 | Providing and laying tack coat of 2.00kgs/10 sqm over the BT surface treated with binter using 2.00 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 3,120 | 1m2 | 33.6 ₹1.0 L | 29.25 ₹91,260 |
| 6.01 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50 mm with paver to the specified grades and cross sections and compacted by vibratory/pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finishers/9m Paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per Specification using CMP as per clause 505 | 271 | m3 | 12,496.1 ₹33.9 L | 10,882 ₹29.5 L |
| 7.01 | Providing and laying Bituminous Concrete to 30mm thick/40mm tk using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher / 9m paver finisher, vibratory / pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP | 163 | m3 | 13,142.6 ₹21.4 L | 11,445 ₹18.7 L |
| 8.01 | Raising the existing circular manholes in heavy type including removing the existing manhole cover with frame by dismantling the existing cement concrete and tar road surface alround the manhole raising the manhole with cement concrete 1:2:4 (one cement two sand and four aggregates ) 25 cm height including centering inside the manhole raising ,laying 15 cm tk cement concrete 1:2:4 with 20mm granite chips including finishing the top surface of manhole alround etc., complete., | 10 | no | 5,886.4 ₹58,864 | 2,701 ₹27,010 |
| 9.01 | Providing and laying of hot applied thermo plastic compound 2.50mm tk including of 2.50mm exchanging of surface applied glass beads as per IRC :35 the finished surface to level uniform and free from sticks and hole etc,complete. | 101 | m2 | 1,022 ₹1.0 L | 5,126.04 ₹5.2 L |
| 67.01 | GST 18% | 1 | GST | 0 ₹12.2 L | 0 ₹11.4 L |
Updated dates
Tender Value
₹69.7 L
EMD Value
₹69,692
Closing Date
28 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai Thallakulam Madurai
Renewal of BT surface Ayyar Street 2nd Cross Street ( 115002R0189 ), Pooman Nagar 4th street 1st Cross Road ( 115002S0111 ),Yogindra Nagar ( 115002R0184 ), Railar nagar Roja street ( 115002R0016 ), Ashok Nagar TNHB Colony 1st Street ( 115002R0027 ),A
2026_MAWS_642510_1
E1/000361/TURIP/Pack-23/25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹69,692
Aringar Anna Maligai
2 Mar 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
14 Jan 2026
Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications.
Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal stone aggregate to Wet Mix Macadam (WMM) specification including premix the materials with water at OMC in machanical mix plant carriage to mixed materials by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clause 406 of MORTH specifications.
Providing and laying Prime coat of 7.00kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev
Providing and laying tack coat of 2.50kgs/10 sqm over the prime surface treated with binter using 2.50 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying tack coat of 2.00kgs/10 sqm over the BT surface treated with binter using 2.00 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50 mm with paver to the specified grades and cross sections and compacted by vibratory/pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finishers/9m Paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per Specification using CMP as per clause 505
Providing and laying Bituminous Concrete to 30mm thick/40mm tk using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher / 9m paver finisher, vibratory / pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP
Raising the existing circular manholes in heavy type including removing the existing manhole cover with frame by dismantling the existing cement concrete and tar road surface alround the manhole raising the manhole with cement concrete 1:2:4 (one cement two sand and four aggregates ) 25 cm height including centering inside the manhole raising ,laying 15 cm tk cement concrete 1:2:4 with 20mm granite chips including finishing the top surface of manhole alround etc., complete.,
Providing and laying of hot applied thermo plastic compound 2.50mm tk including of 2.50mm exchanging of surface applied glass beads as per IRC :35 the finished surface to level uniform and free from sticks and hole etc,complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
23.pdf
Tender Documents • 0.94 MB
BOQ_769763.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid