Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹38.8 L+₹5.2 L (15.3%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹40.8 L+₹7.1 L (21.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹42.4 L+₹8.7 L (25.9%)Admitted-Finance BERWAR KISHTAWAR JAMMU J K 182204 | KISHTAWAR | KISHTAWAR | JAMMU AND KASHMIR | 182204 | L4 | Admitted-Finance |
Tender Value
₹39.6 L
EMD Value
₹79,280
Closing Date
28 Oct 2026, 1:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_328643_1
61 of 2026
Open Tender
Agricultural or Forestry
Percentage
60 days
Kishtwar and Nagseni Ranges
SBD
2 documents required · 2 mandatory
₹1,100
DFO Kishtwar
₹79,280
5 Nov 2026
19 Oct 2026
30 Oct 2026
19 Oct 2026
28 Oct 2026
19 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair of PCC Sq. Posts Fencing in compartments 43/K (2000 rft), 51/K (1900 rft), 59/K (2100 rft), 16/N (3000 rft), 16/N (2500 rft), 20c/N (1500 rft), 17/N (1500 rft), 19/N (1600 rft) & 2a/N (1800 rft): Erection of leaned/bent PCC square fence posts in position of alignment with cement concrete in the ratio of (1cement:3sand:6 graded stone aggregate) including curing complete and fixing of every 8th and corner PCC fence post in cement concrete block of 1.5' x 1.5' x 1.5'. Providing, stretching and fixing G.I. barbed wire in required rows including binding wire and fastening complete. Straightening and refixing serviceable existing fence posts and tightening of loose fencing barbed wire by manual labour. | 17,900 | Rft | 16.74 | ₹2,99,646 |
| 2 | Repair of Wooden Posts Fencing in compartments 63/K (3000 rft), 63/K (3000 rft), 12a/N (2200 rft), 15/N (1500 rft), 20a/N (2000 rft), 3a/N (500 rft), 3c/N (500 rft), 4a/N (500 rft), 4a/N (2000 rft), 3c/N (1600 rft), 4a/N (2500 rft) & 1d/N (2800 rft): Replacement of poles rotten wooden fence posts of size 6 feet of length with minimum mid girth of 18 inch including supply and carriage upto work site. Erection of leaning sound wooden fence posts using manual labour. Strutching, and aligning G.I Barbed wire strands over the repaid section, including tightening with structures and fixing securely to wooden posts with U-nails/ stepples. | 22,100 | Rft | 16.74 | ₹3,69,954 |
| 3 | PB Plantation work in compartments 63/K (4000 Nos), 63/K (3500 Nos), 43/K (2700 Nos), 51/K (2500 Nos), 59/K (3800 Nos), 12a/N (3000 Nos), 16/N (2800 Nos), 16/N (3000 Nos), 15/N (3000 Nos), 20a/N (3000 Nos), 20c/N (2000 Nos), 17/N (2500 Nos), 19/N (3000 Nos), 3a/N (1000 Nos), 3c/N (1100 Nos), 4a/N (1100 Nos), 4a/N (2500 rft), 3c/N (2000 Nos), 2a/N (2500 Nos), 4a/N (3000 Nos) & 1d/N (3000 Nos): Pit Plantation of Poly Bags:- Clearance of site and digging of pits of size 45 cm x 45 cm x 45 cm along surface in staggered contours and flat area. Removal of soil from dug-out pits and stacking near pits. Cleaning the dug-out soil of stones, pebbles, grasses and other unwanted material. Mixing of decomposed humus/manure with cleaned soil. Refilling of dug-out pits with prepared soil. De-wrapping of P.B. raised saplings and disposal of poly bags outside plantation area. Planting of P.B. raised saplings including carriage, loading/unloading from designated nursery to closure site | 55,000 | No | 29.34 | ₹16,13,700 |
| 4 | NR Plantation work in compartments 63/K (4500 Nos), 63/K (4000 Nos), 43/K (3000 Nos), 51/K (3000 Nos), 59/K (3500 Nos), 12a/N (3000 Nos), 16/N (3000 Nos), 16/N (3000 Nos), 15/N (3000 Nos), 20a/N (3000 Nos), 20c/N (3000 Nos), 17/N (3000 Nos), 19/N (3000 Nos), 3a/N (1000 Nos), 3c/N (1000 Nos), 4a/N (1000 Nos), 4a/N (3000 rft), 3c/N (3000 Nos), 2a/N (3000 Nos), 4a/N (3000 Nos) & 1d/N (3000 Nos): Pit plantation of NR Plants:- Clearance of site and digging of pits of size 45cm x 45cm x 45cm in staggered fashion along the contours as well as on flat surface. Extraction / mechanical transportation of Naked root plants from the designated nurseries including loading/unloading/ head carriage upto closure site. Removing of earth roots stones pebble and grasses etc from the dugout soil of the pits and mixing of decomposed humus with the clean soil. Planting of NR plants in pits, refilling of pits with the clean soil mixed with humus and ramming complete. | 60,000 | No | 23.17 | ₹13,90,200 |
| 5 | Patch Sowing work in compartments 63/K (1000 Nos), 63/K (1740 Nos), 43/K (1000 Nos), 51/K (1000 Nos), 59/K (1260 Nos), 12a/N (1000 Nos), 16/N (1000 Nos), 16/N (1000 Nos), 15/N (1000 Nos), 20a/N (1000 Nos), 20c/N (1000 Nos), 17/N (1000 Nos), 19/N (1000 Nos), 3a/N (500 Nos), 3c/N (500 Nos), 4a/N (500 Nos), 4a/N (500 rft), 3c/N (1000 Nos), 2a/N (1000 Nos), 4a/N (1000 Nos) & 1d/N (1000 Nos): Patch sowing:- Clearance of site and preparation of patches of size 45cm x 45cm x 15cm by digging and loosening the soil in a staggered fashion along the contours as well as on flat surfaces. Removing of weeds, earth roots, stones, pebbles, and other unwanted material from the dugout patches. Sowing of site specific seeds in the dugout patches including supply of seeds. | 20,000 | No | 6.99 | ₹1,39,800 |
| 6 | Dibbling works in compartments 63/K (1000 Nos), 63/K (1800 Nos), 43/K (1000 Nos), 51/K (1000 Nos), 59/K (1500 Nos), 12a/N (1000 Nos), 16/N (1000 Nos), 16/N (1000 Nos), 15/N (1000 Nos), 20a/N (1000 Nos), 20c/N (1000 Nos), 17/N (1000 Nos), 19/N (1000 Nos), 3a/N (600 Nos), 3c/N (600 Nos), 4a/N (600 Nos), 4a/N (900 rft), 3c/N (1000 Nos), 2a/N (1000 Nos), 4a/N (1000 Nos) & 1d/N (1000 Nos): Dibbling:- Clearance of site and digging of patches of size 45cm x 45cm x 15cm in staggered fashion along the contours as well as on flat surface by manual Labour. Removing of unwanted staff, weeds and grasses etc. from the dugout patches. Dibbling of site specified seeds in the dugout patches including supply of seeds. | 21,000 | No | 7.18 | ₹1,50,780 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_1112729.xls
BOQ • 0.32 MB
2026_FD_328643_1.pdf
PDF • 0.19 MB
2026_FD_328643_1.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .