Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.1 LAdmitted-Finance | -35.11% | ₹34.1 L | L1 | Admitted-Finance |
| 2 | L2₹35.4 LAdmitted-Finance | -32.61% | ₹35.4 L | L2 | Admitted-Finance |
| 3 | L3₹38.7 LAdmitted-Finance | -26.30% | ₹38.7 L | L3 | Admitted-Finance |
Tender Value
₹52.5 L
EMD Value
₹1.0 L
Closing Date
24 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Higher Secondary School Madwan (Construction of Art Craft Room, Library Room and Physics Room at HSS Madwan.
2026_PWDJK_312611_1
NIT NO 18 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
90 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Executive Engineer RnB Division
₹1.0 L
30 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drilling of old concrete bed for fixing steel rainforcement and useing airodite chimacl for proper bonding etc complete job | 1 | No | 15,000 | ₹15,000 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, in all kinds of soil | 10.62 | Cum | 187.3 | ₹1,989.13 |
| 3 | Providing and laying Stone solling Hand packed including compacting, watering including all carriages of material complete. | 131.31 | Cum | 1,000 | ₹1,31,310 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level (1:3:6) (1Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size) | 16 | Cum | 5,733.6 | ₹91,737.6 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)incl all carriages 20mm nominal size) Crushed. (All Works up to Plinth level) raft | 16.38 | Cum | 7,275.25 | ₹1,19,168.59 |
| 6 | Providing/laying in position specified grade excluding the cost of centering & shuttering . (M-15 Mix) 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded stone aggregate 20mm nominal size- crushed.) | 15.89 | Cum | 6,591.25 | ₹1,04,734.96 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in: 1:6 (1 cement and 6 coarse Sand ) in superstructure above plinth level upto first floor level | 45.87 | Cum | 9,027.2 | ₹4,14,077.66 |
| 8 | Providing and fixing of wood work in frames of door/ window /arch windows /ventilator wrought frames (chowkats) imported Kd Wood. | 2.11 | Cum | 58,000 | ₹1,22,380 |
| 9 | Providing and fixing 32 x5mm flat iron hold fast including fixing of frames with nuts and bolts. | 132 | Nos | 60 | ₹7,920 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, Coloumns, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).incl all carriages Crushed Aggrigrates. | 35.35 | Cum | 9,821.85 | ₹3,47,202.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1011872.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid