Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical The bidder not fulfill the QR |
| 3 | Rejected-Technical | Rejected-Technical The bidder not fulfill the QR |
Tender Value
₹10.6 L
EMD Value
₹10,598
Closing Date
23 Mar 2021, 11:00 amClosed
CE(CTPP)
ADM Building, Motipura Chowki, Chhabra
PROCUREMENT OF PRINTING MATERIAL FOR CTPP CHHABRA
2021_RRVUN_212680_1
2142/2020-21(MM)
Open Tender
Miscellaneous Goods
Item Wise
90 days
CTPP, RVUNL, Chhabra
As per uploaded our tender documents
2 documents required · 2 mandatory
₹590
Yes
Account Officer, CTPP, RVUNL, Chhabra
₹10,598
Yes
21 Jun 2021
8 Feb 2021
23 Mar 2021
8 Feb 2021
23 Mar 2021
8 Feb 2021
Shift Chemist Activity register Size17x27/4
DM Plant-I Activity register Size17x27/4
DM Plant-II Activity register Size17x27/4
DM Plant phase-I Log Book Size17x27/2
DM Plant phase-II Log Book Size17x27/2
PT Plant phase-I Activity register Size17x27/4
PT Plant phase-II Activity register Size17x27/4
ETP Plant phase-I Activity register Size17x27/4
ETP Plant phase-I Activity register Size17x27/4
CW Clorination system phase-I Activity register Size17x27/4
CW Clorination system phase-I Activity register Size17x27/4
Chemistry DMR 00:00 Hrs.Size18x22/4
Boiler log sheet phase-I Size17x27/2
Boiler log sheet phase-II Size17x27/2
Boiler feed and steam water cycle report Size17x27/4
Flue gas analysis register Size17x27/4
Flue gas reportSize17x27/4
PTW Book Size18x22/4
Indent BookSize17x27/2
Permite Issue registerSize17x27/4
A) Bulk chemical consumption registerSize17x27/4
B) Bulk chemical consumption registerSize17x27/4
C) Bulk chemical consumption registerSize17x27/4
D) Bulk chemical consumption registerSize17x27/4
Raw water pum phouse phase-I log-sheetSize17x27/2
Raw water pum phouse phase-II log-sheetSize17x27/2
Clarifier water analysis / CW water analysis register phase-ISize17x27/4
Clarifier water analysis / CW water analysis register phase-IISize17x27/4
MCN BookSize17x27/4
A) Raw water analysis registerSize17x27/4
B) DMCW water analysis registerSize17x27/4
MOT oil analysis register phase-I&IISize17x27/4
Oil analysis report phase-I&IISize17x27/4
Hydrogen purity analyser registerSize17x27/4
Hydrogen purity analysis reportSize17x27/4
A) SWAS registerSize17x27/4
B) SWAS registerSize17x27/4
Vehicle/ Material gate Pass bookSize18x22/4
Empty RegisterSize17x27/4
A) Raw water pump running Hrs. registerSize17x27/4
B) Raw water Digital flow meter reading registerSize17x27/4
C) DM Water production and consumption registerSize17x27/4
Leave application performaSize17x27/4
Analysis report register (Wash & Raw Coal)Size17x27/4
Analysis report register (Wash & Raw Coal)Size17x27/4
Station coal register Phase-I & IISize17x27/4
Fly & Bottam Ash RegisterSize17x27/4
PCBSize17x27/4
Turbine PanelSize22x28/4
Fans PanelSize22x28/4
Steam & WaterSize22x28/4
Generatpr PanelSize22x28/4
Fuel mill deskSize22x28/4
CW & ACW Pump HouseSize22x28/4
Cooling towersSize22x28/4
Condensate Extraction PumpSize22x28/4
ID Fans, FD Fans & PA FansSize22x28/4
Hydrogen Seal Oil SystemSize22x28/4
Mill AreaSize22x28/4
Boiler feed pump areaSize22x28/4
Boiler operating floor (19.5 M)Size22x28/4
HT (6.6 KV L.T. (415) Switchgear roomSize22x28/4
EPSSize22x28/4
Lub oil pumps /oil coolers centerifugeSize22x28/4
Check list of Pump (as per Sample Enclosed)Size17x27/4
Check list of CT Fans (as per Sample Enclosed)Size17x27/4
DMCW/CT Makeup Pumps Vibration Log Sheet (as per Sample Enclosed)Size17x27/4
CW/ACW Pumps Vibration Log Sheet (as per Sample Enclosed)Size17x27/4
CT Fans Vibration Log Sheet (as per Sample Enclosed)Size17x27/4
Compressor log Sheet (as per Sample Enclosed)Size17x27/4
PondFly/Bottom, Ash Entry Book in Duplicate (from Sr.No. 1-100 in a book)as per Sample EnclosedSize17x27/8
Fly Ash Exit Gate Book in Triplicate(From Sr.No. 1-50 in a Book)as per sample enclosedSize17x27/8
Bottom Ash Exit Gate Pass Book in Triplicate(From Sr.No 1-50 in a Book)as per sample enclosedSize17x27/8
Fly Ash handling daily data Log Book for U#1 & 2 (Sr. No. 1 to 31 in a Book) as per Sample of formate EnclosedSize17x27/4
Bottom Ash handling daily data Log Book for U#1 & 2 From (Sr. No. 1 to 31 in a Book) as per Sample of formate EnclosedSize17x27/4
Fly Ash handling daily data Log Book for U#3 & 4(Sr. No. 1 to 31 in a Book) as per Sample of formate EnclosedSize17x27/4
Bottom Ash handling daily data Log Book for U#3 & 4 From (Sr. No. 1 to 31 in a Book) as per Sample of formate EnclosedSize17x27/4
Fire Pump House Check List (as per sample enclosed)Size17x27/4
DELUGE Valve Check List Unit # 1 &2Size17x27/4
DELUGE Valve Check List Unit # 3 &4Size17x27/4
Hydrant Valve Check List Unit # 1 &2Size17x27/4
Hydrant Valve Check List Unit # 3 & 4Size17x27/4
Maintenance ScheduleSize17x27/4
APH Parameter registerSize17x27/4
Boiler parameter registerSize17x27/4
Mill ParameterSize17x27/4
Leave application performaSize17x22/4
HR PerformaSize17x22/4
Covering letter performaSize17x22/4
NAC performaSize17x22/4
PL form performaSize17x22/4
Empty / Blank registerSize17x22/4
Vibration log sheet of Unit-1Size17x27/4
Vibration log sheet of Unit-2Size17x27/4
Vibration log sheet of Unit-3Size17x27/4
Vibration log sheet of Unit-4Size17x27/4
Current measurement log sheet set of (Mill MCC+ Unit PMCC+N/E PMCC+Turbine MCC+Boiler MCC+ PH AC MCC+PH Vent. MCC) of Unit-1Size17x27/4
Current measurement log sheet set of (Mill MCC+ Unit PMCC+ N/E PMCC+ Turbine MCC+ Boiler MCC+ IDCT PMCC+ PH Vent. MCC) of Unit-2Size17x27/4
Current measurement log sheet set of (Mill MCC+ Unit PMCC+ N/E PMCC+ Turbine MCC+ PH AC MCC+ PH Vent. MCC) of Unit-3Size17x27/4
Current measurement log sheet set of (Mill MCC+ Unit PMCC+N/E PMCC+Turbine MCC+IDCT PMCC+ PH Vent. MCC) of Unit-4Size17x27/4
Gate pass book in triplicate and different color i.e. Red, Yellow and white Size17x27/4
Daily reading log sheet of Generator and its auxiliary.Size17x27/4
Daily report of Generator of Unit-1 to 4Size17x27/4
SD RefundSize17x27/4
EMD refundSize17x27/4
Bin CardSize17x27/4
Stock Inward RegisterSize17x27/4
Store quantity ledgerSize17x27/2
Store receipt cum inspection note (SRN)Size17x27/2
Material requisition com issue note (SINSize18x22/2
COS 6 registerSize17x27/4
COS 23 registerSize17x27/4
Misc type IN/out material registerSize17x27/2
Material In RegisterSize17x27/2
Material Out RegisterSize17x27/2
Outer visitor gate pass registerSize17x27/2
Private vehicle In/Out registerSize17x27/4
Regular vehicle for RVUNL Staff In/Out registerSize17x27/4
BHG duty chart formatSize17x27/4
BHG Attendance formatSize17x27/4
Fly Ash IN/Out Vehicles FormatSize17x27/4
Bottom Ash IN/Out Vehicles FormatSize17x27/4
Sillo No. 1,2,3,4&5 Bunkers IN/Out FormatSize17x27/4
Stock registerSize17x27/4
PCB registerSize17x27/4
Dispatch RegisterSize17x27/4
RR RegisterSize17x27/4
Officers C-1 registerSize17x27/4
Staff C-1 registerSize17x27/4
Staff C-2 registerSize17x27/4
TA Bill FormatSize17x27/4
Voucher Allocation statementSize17x27/4
Budget registerSize17x27/4
TA-Bill RegisterSize17x27/4
MRC- bill registerSize17x27/4
Peon BookSize17x27/4
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .