| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 CrAccepted-AOC | ₹17.8 Cr | L1 | Accepted-AOC PROPER |
Tender Value
₹19.8 Cr
EMD Value
₹39.6 L
Closing Date
30 Dec 2023, 2:00 pmClosed
Chief Engineer Water Resources Department
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Construction of flood wall to save Gohpur area from flood inundation of River Chatrang from Railway Line to NH-15 including extension at Madhya Chatrang.
2023_DoWR_34621_1
BISWANATH/2023-24/RIDF/I
Open Tender
Civil Works
730 days
BISWANATH
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹39.6 L
Yes
11 Feb 2024
12 Dec 2023
30 Dec 2023
12 Dec 2023
30 Dec 2023
22 Dec 2023
Amount
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Mechanical means With dewatering (i)upto 3m depth
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Mechanical means With dewatering (ii) 3m to 6m depth
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Mechanical means With dewatering (iii)Above 6m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
RCC Grade M25 : Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (II)With plasticiser (E)( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( asterplast PAE or equivalent) and accelerating plasticiser( Masterplast ACPL or equivalent) conforming to IS-9103-1999 F. RCC Grade M25 a.Height upto 5m CASE II.With Batching Plant, Transit Mixer and Concrete Pump
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (N) Without Plasticiser B.RCC Grade M25 CASE-II Using Batching Plant, Transit Mixer and Concrete Pump For solid slab super-structure Height upto 5m
12 mm cement plaster of mix : 13.1.21:6 (1 cement: 6 fine sand)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Earth work in excavation of drainage channel by mechanical means to the proper grade and slopes as required including disposing the excavated debris/soil to a safe distance of minimum 50 m distance, etc. complete as directed. For lead upto 50 m and all lifts Normal Soil
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid