| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.4 L+₹73.58 (<0.01%)Rejected-Finance 228 VIDYA SAGAR SARANI KOLKATA 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | ₹7.4 L+₹73.58 (<0.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.6 L+₹23,913.91 (3.25%)Rejected-Finance 337 C INDIRA GANDHI ROAD KONNAGAR HOOGHLY 712235 | KONNAGAR | HOOGHLY | WEST BENGAL | 712235 | ₹7.6 L+₹23,913.91 (3.25%) | L3 | Rejected-Finance L3 |
Tender Value
₹7.4 L
EMD Value
₹15,000
Closing Date
9 Feb 2026, 12:00 pmClosed
DG (ROADS)
Chaplin square, 5/2, Chowringhee place, Kol-13
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT ADI GANGA CANAL SIDE ROAD FROM 2 NO. USHA GATE TO 14, SUBHODH PARK IN WARD NO. 112 UNDER BR XI
2026_KMC_996817_1
KMC/ROADS/2025-2026/412
Open Tender
CIVIL WORKS
Percentage
30 days
SUBHODH PARK
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
Yes
2 Sept 2026
31 Jan 2026
11 Feb 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) (Ref : PWD (Rds & Brdgs)-2018 It. No. 3.04 Page No.237 | 160.58 | CUBIC METER | 89.9 | ₹14,436.37 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume).
(a) For Fine Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-3) | 48.6 | CUBIC METER | 1,400.03 | ₹68,041.46 |
| 3 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm)
( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10 (ii) Page No.247 & page-222 sl. No-5 (f)) | 32.4 | CUBIC METER | 1,944.9 | ₹63,014.76 |
| 4 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | 9.11 | CUBIC METER | 4,761 | ₹43,384.61 |
| 5 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 60 | EACH | 298.22 | ₹17,893.2 |
| 6 | Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 60 | EACH | 214.63 | ₹12,877.8 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed.
a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 240 | METER | 8.17 | ₹1,960.8 |
| 8 | Taking out stone slab of kerb & channel of road side drain and stacking as directed.
b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 240 | METER | 8.17 | ₹1,960.8 |
| 9 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).
a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 240 | METER | 21.43 | ₹5,143.2 |
| 10 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).
b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 240 | METER | 18.3 | ₹4,392 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
TENDERFORM412.pdf
Tender Documents • 0.83 MB
BOQ_2440573.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .