Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹18.8 L
EMD Value
₹37,000
Closing Date
16 Oct 2026, 11:00 am5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Office of Superintending Engineer Gorakhpur Circle
Executive Engineer UPAVP CD Gorakhpur-02, Bast
Construction of Toilet blocks at Kasturba Gandhi Balika Vidyalaya in Kaptanganj Distt- Basti
2026_UPHDB_1193400_1
462/G-2/245 Date- 01.10.2026 (Kaptanganj)
Open Tender
Civil Works
Percentage
150 days
Kaptanganj Basti
As per Technical bid
2 documents required · 2 mandatory
₹1,180
Executive Enginner UPAVP CD GKP-02, Basti
₹37,000
7 Oct 2026
7 Oct 2026
16 Oct 2026
7 Oct 2026
16 Oct 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. DSR-2.31 | 33.14 | Sqm | 12.94 | ₹428.83 |
| 2 | Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C within a lead of 30 m. (All kind of soil) | 39.74 | Cum | 130.46 | ₹5,184.48 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 27.82 | Cum | 144.06 | ₹4,007.75 |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 8.91 | Cum | 514.87 | ₹4,587.49 |
| 5 | Local Sand filling in plinth including supply of neccasary quantity of sand from the site of work 8km and including watering dessing etc. including cost of all materials labour and T&P etc . Required for proper completion of the work. | 2.97 | Cum | 1,560.96 | ₹4,636.05 |
| 6 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (3) Treatment of top surface of plinth filling 5 liters/sqm With Chlorpriphos EC 20% with 1% concentration | 38 | Sqm | 227.89 | ₹8,659.82 |
| 7 | Providing and laying Cement Concret 1:4:8 (1cement :4coarse sand :8 stone aggregate 40mm including supply of all material ,labour and t&p etc.required for completion of work. | 5.13 | Cum | 5,006.82 | ₹25,684.99 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate ) Footing | 3.61 | Cum | 6,648.63 | ₹24,001.55 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate ) column | 0.3 | Cum | 6,648.63 | ₹1,994.59 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate ) Plinth beam | 2.84 | Cum | 6,648.63 | ₹18,882.11 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
Bid.pdf
Tender Documents • 19.03 MB
BOQ_2252501.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .