| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 03 GOVIND PURAM EIDGHAH ROAD BIJNOR BIJNOR UTTAR PRADESH 246701 | BIJNOR | UTTAR PRADESH | 246701 | Admitted-Finance |
| 2 | Admitted-Finance G 132 FIRST FLOOR G BLOCK SECTOR 63 SECTOR 63 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | Admitted-Finance |
Tender Value
₹22.8 L
EMD Value
₹25,000
Closing Date
5 Aug 2020, 12:00 pmClosed
Superintending Engineer
Electricity Transmission Circle Agra Kakraitha Road, Near Amar Ujala Press, Sikandara , Agra
Annual maintenance of 400 KV S/S Agra under E400 KV S/S Division Agra
2020_UPTCL_490497_1
ET_75_ETC_A_20 21
Open Tender
Electrical Works
Lump-sum
365 days
Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE_ETD II Agra
₹25,000
18 Aug 2020
7 Jul 2020
6 Aug 2020
7 Jul 2020
5 Aug 2020
7 Jul 2020
Maintenance of Switchyard
Maintenance of complete 400kV, 220 kV, 132 kV, 33 kV Switchyard equipment’s like CB, CT, PT, isolator, Transformer, ACPS cubical box, marshalling box, DM box with a team having sufficient experience of switchyard and good knowledge of electrical wiring at S/S. (As per annexure-1)
Technician = 3 Nos.
Helper = 2 Nos.
Cleaning work
Daily cleaning and mopping (one a day) of floor of control room, corridors, lobby, administrative building, committee room, carrier room, battery room, AC plant, DG room, toilets (05 nos.) in the morning before 10:00am by deputing required nos. of persons with broom, harpic, colin, finial, tile cleaning agent, wet cloth etc. including cost of all labour and material. ( area 1750 sq.mtr.)
Weekly cleaning of glass window in control room, corridors, lobby, administrative building, committee room, carrier room, battery room, AC plant with colin, wet cloth including cost of all labour and material. (area 120 sq.mtr.)
Weekly cleaning of main doors inside the switchyard, in front of control room DG room etc. with broom including cost of all labour and material. (Area 14480 sq.mtr.)
Grass cutting work
Grass cutting (4 times) + Chemical spray (1 time) of switchyards and around control room including among others of uprooting of rank vegetation grass and thorny bushes aplenty over the girth up to 100 cm, 25 cm, below and 75 cm above the ground and removal of rubbish, debris outside the premises of substation and other associated works, as per details given below including cost of all labour and T&P etc to complete the job. (As per annexure-2).
Cable trench cleaning work
Thorough cleaning of cable trenches of following sizes by removing earth deposits and other foreign material in bottom of trenches & over cable racks, throwing out the waste outside the boundary of substation and other works like proper dressing of cables & other necessary works complete the job. The scope of work also includes removal of trench covers & it’s proper fixing after completion of work including cost of all man, material, labour and T&P. (As per annexure-3)
Miscellaneous work like AC etc.
a. Minor maintenance of AC unit having capacity 05x16.5/2x50 which installed in control room.
b. Switchyard lighting of 400 kV, 220 kV & 132 kV including 03 Nos. high mast light (30 mtr. Height) & 15 nos. aviation light situated in switchyard and also including of repairing of switchyard periphery lighting and General maintenance of DG room in which situated control panel system of 0.4kV station supply and maintaining the power supply continuously of ACPS power cubical for 06 nos. power T/F and various 400/220/132 kV bay for CB, isolators, compressors, lightening etc. through ACPS cubical which installed suitable place in switchyard.
c. Taking reading of DC voltage, check the gravity (each battery) of 2x220V & 2x48V battery bank and maintain in the register regularly.
The above work column a, b, c carried out by a 01 no. technician & 01 no. helper having sufficient knowledge DC system and electrical wiring.
01 No. Technician
01 No. Helper
Firefighting including Emulsifier system
Operation and maintenance of firefighting equipment & Emulsifier System including diesel engine, mainpump, jockey pump, compressor, deluge valve & water pipe line on the 06 nos. power transformer, 01 no. 50 MVAr reactor, 12 volt battery with charger, fire hydrant system including attending leakage and maintain water pressure and air pressure in the complete five hydrant pipe line network from DG room to 400/220/132/33 kV switchyard and main store etc. with 01 no. experience person which having sufficient good knowledge Emulsifire system & minimum 5 years’ experiencein this field.(As per annexure-4)
ELITE POWERTECH Private Limited
HITECH ENGINEERS
DEEP ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .