Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-Finance | ₹24.7 L | L1 | Accepted-Finance As per BOQ comparative |
| 2 | L2₹25.0 L+₹23,277.71 (0.94%)Accepted-Finance | ₹25.0 L+₹23,277.71 (0.94%) | L2 | Accepted-Finance As per BOQ comparative |
| 3 | L3₹25.4 L+₹65,177.58 (2.63%)Accepted-Finance | ₹25.4 L+₹65,177.58 (2.63%) | L3 | Accepted-Finance As per BOQ comparative |
| 4 | L4₹27.4 L+₹2.6 L (10.6%)Accepted-Finance | ₹27.4 L+₹2.6 L (10.6%) | L4 | Accepted-Finance As per BOQ comparative |
| 5 | L5₹29.6 L+₹4.9 L (19.8%)Accepted-Finance PHYANG LEH | KARGIL | LADAKH | 194102 | ₹29.6 L+₹4.9 L (19.8%) | L5 | Accepted-Finance As per BOQ comparative |
Tender Value
₹42.3 L
EMD Value
₹99,880
Closing Date
18 Aug 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Restoration of Flood protection work at Baima Nallah(Under Capex)
2026_PWD_19317_1
28 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
60 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹1,000
Payable To Executive Engineer InFC division Leh
₹99,880
25 Aug 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
a)All kinds of soil 60% | 140.94 | Cum | 445.85 | ₹62,838.1 |
| 2 | b)Ordinary rock 20% | 46.98 | Cum | 986.46 | ₹46,343.89 |
| 3 | c)Hard rock (requiring blasting) 20% | 46.98 | Cum | 1,305.55 | ₹61,334.74 |
| 4 | Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed
tightly); including cost of stones but excluding cost of wirecrates | 975.35 | Cum | 1,494.48 | ₹14,57,641.07 |
| 5 | Making knitted wire crates of approved mesh-size; including weaving, binding
sides and partitions, and binding top after filling; excluding cost of filling, stones
and weaving materials | 354.39 | Sqm | 100.67 | ₹35,676.44 |
| 6 | Supply of wooven crate including carriage complete job. | 105 | Nos | 4,237.28 | ₹4,44,914.4 |
| 7 | Supply of Lids including carriage complete job. | 210 | Nos | 423.72 | ₹88,981.2 |
| 8 | Hard rock blasting required for crate filling complete job. | 707.41 | Cum | 1,305.55 | ₹9,23,559.13 |
| 9 | Carriage of material by mechanical transport includind loading unloading and stacking. Stone an avg lead of 20 kms | 975.35 | Cum | 452.67 | ₹4,41,511.68 |
| 10 | Carriage of material by manual labour includind loading unloading and stacking. Solling stone an avg lead of 1Km | 585.21 | Cum | 1,144.05 | ₹6,69,509.5 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_45905.xls
BOQ • 0.28 MB
corri7.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .