Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -14.14% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -10.70% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.6 LAdmitted-Finance | -6.20% | ₹1.6 L | L3 | Admitted-Finance |
| 4 | L4₹1.7 LAdmitted-Finance | -5.00% | ₹1.7 L | L4 | Admitted-Finance |
| 5 | L5₹1.7 LAdmitted-Finance | -3.92% | ₹1.7 L | L5 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹3,500
Closing Date
1 Apr 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD RnB Division Marwah
CONSTRUCTION OF GIRLS TOILET AT GOVT PRIMARY SCHOOL KOKANDOO MARWAH
2026_PWDJK_306749_1
e-NIT No.56 of 2025-26 dated 25-03-2026
Open Tender
Civil Works
30 days
Marwah
CONSTRUCTION OF GIRLS TOILET AT GOVT PRIMARY SCHOOL KOKANDOO MARWAH
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RnB Division Marwah
₹3,500
Executive Engineer PWD RnB Division Marwah
6 Apr 2026
25 Mar 2026
1 Apr 2026
25 Mar 2026
1 Apr 2026
25 Mar 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earth work in excavation in foundation by manual means over areas(exceeding 30 cm in depth and up to 1.50m depth 1.50 m in width as well as 10 sqm on plan ) , including disposal of excavated earth upto I metre for cutting of edges ,disposal earth to be leveled and neatly dressed.All kinds of soil . | - | Cum | - | - | |
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | Cum | - | - | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - | |
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | - | Cum | - | - | |
Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) | - | Cum | - | - | |
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using flas 30x6mm for diagonal braces and central cross piece. | - | Sqm | - | - | |
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. | - | KG | - | - | |
Centering and Shuttering including strutting, popping and removal of form work | - | - | - | - | |
(A) Suspended floors, roofs, landings, balconies and access platforms | - | Sqm | - | - | |
Edges of slabs and breaks in floors and walls
Under 20 cm wide | - | mtr | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_995792.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid