Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC MOHAMMADGANJ PALAMU JHARKHAND | PALAMU | JHARKHAND | 822101 | ₹9.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.7 CrRejected-Finance | ₹9.7 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical NA | PALWAL | HARYANA | 121004 | - | - | Rejected-Technical ENC letter no 1926 dated 02.06.26 |
| 4 | Rejected-Technical | - | - | Rejected-Technical ENC letter no 1926 dated 02.06.26 |
| 5 | Rejected-Technical DALTONGANJ | DUMKA | JHARKHAND | 814101 | - | - | Rejected-Technical ENC letter no 1926 dated 02.06.26 |
Tender Value
₹9.7 Cr
EMD Value
₹19.4 L
Closing Date
27 Apr 2026, 5:00 pmClosed
E.E. R.W.D. works Div. Daltonganj
O/o E.E. R.W.D. works Div. Daltonganj
Strengthening of Road From Saraidih T04 to Dagra Picket (L-8.870 Km.) under Nawdiha Bazar Block
2026_RWD_112548_1
EE/RWD/DALTONGANJ/Z/03/25-26
Open Tender
Civil Works
455 days
Daltonganj
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹19.4 L
Yes
29 Jun 2026
7 Apr 2026
29 Apr 2026
7 Apr 2026
27 Apr 2026
7 Apr 2026
7 Apr 2026 - 27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | - | Ha | - | - |
Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) | - | M3 | - | - | |
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.
By Mechanaical Means using Hydraulic excavator. | - | M2 | - | - | |
Dismantling of Cement Concrete Pavements (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately) | - | M3 | - | - | |
Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works.
Above 900mm dia | - | M | - | - | |
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | - | M3 | - | - | |
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
Including Royalty etc@ Rs. 27.48 per cum but excluding the cost of watering, rolling & compaction. | - | M3 | - | - | |
Granular Sub-Base with Coarse Graded Material (Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | - | M3 | - | - | |
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | - | M3 | - | - | |
Prime Coat over WMM/WBM (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.) | - | M2 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_151960.xls
BOQ • 0.31 MB
sbdnit02saraidihdagra.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid