Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹3.1 L Quoted ₹3.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.1 LRejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹3.1 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DEVI FABRICATORS AND ENGINEERING CONTRACTORS L1 | SS ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for loading, unloading of 1 set of GRP / FRP fan blades ( 8 Nos.) of cooling tower ID fans of stage-I from MTPS-I central stores to outside workshop for reconditioning works and return back the same from outside workshop to MTPS -I central stores after completion of Reconditioning works. | 1 | set (8 Nos) | 3,025 ₹3,025 Lowest | 3,150 ₹3,150 |
| 2.00 | Charges for cleaning of blades with wire brush and acid washing. Grinding and removing of existing resin, putty and chopped strand mat over the arm and blade surface of entire blade. | 8 | Nos | 11,735 ₹93,880 Lowest | 12,200 ₹97,600 |
| 3.00 | Charges for smooth leveling by grinding and sander machine, applying putty on the arm and blade surface, smooth leveling by emery sheet. After that the chopped strand mat to be wounded on the blade and arm surface area mixed with Isobathic resin, Catalyst, Accelerator & pigment as recondition work. | 8 | Nos | 11,735 ₹93,880 Lowest | 12,200 ₹97,600 |
| 4.00 | Charges for applying two coats of Isobathic resin for smooth finishing over the entire surface of blade, weighing of blade should be maintained 65Kgs+/-0.5 and marking the weight. | 8 | Nos | 6,780 ₹54,240 Lowest | 7,050 ₹56,400 |
| 5.00 | Charges for painting with two coats of 1st quality epoxy grey paint over the surface of the GRP fan blades including the cost of paint. | 40 | M2 | 110 ₹4,400 Lowest | 120 ₹4,800 |
| 6.00 | Cost of Epoxy Smoke Grey paint | 8 | litres | 375 ₹3,000 Lowest | 390 ₹3,120 |
| 7.00 | Cost of Epoxy Thinner | 2 | litres | 180 ₹360 Lowest | 190 ₹380 |
| 8.00 | Hire charges for Transporting (Vehicle Charge) Sl.No.1 | 1 | No | 2,195 ₹2,195 Lowest | 2,285 ₹2,285 |
| 9.00 | Cost of Putty Material for Sl.No.3 | 16 | Kgs | 110 ₹1,760 Lowest | 120 ₹1,920 |
| 10.00 | Cost of Chopped strand Material for Sl.No.3 | 64 | Kgs | 154 ₹9,856 Lowest | 165 ₹10,560 |
Tender Value
Refer Docs
EMD Value
₹2,900
Closing Date
24 Mar 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I M I CA CWS I Reconditioning of released GRP fan blades 1 Set for Cooling Tower ID fans of Stage I of Paharpur Model 1514 11
2026_EB_672886_1
CE / MTPS-I / SE / M-I / CA /OT.552/ 2025-26
Open Tender
Power/Energy Projects/Products
Works
30 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,900
Yes
30 Jul 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for loading, unloading of 1 set of GRP / FRP fan blades ( 8 Nos.) of cooling tower ID fans of stage-I from MTPS-I central stores to outside workshop for reconditioning works and return back the same from outside workshop to MTPS -I central stores after completion of Reconditioning works. | 1 | set (8 Nos) | - | - |
| 2 | Charges for cleaning of blades with wire brush and acid washing. Grinding and removing of existing resin, putty and chopped strand mat over the arm and blade surface of entire blade. | 8 | Nos | - | - |
| 3 | Charges for smooth leveling by grinding and sander machine, applying putty on the arm and blade surface, smooth leveling by emery sheet. After that the chopped strand mat to be wounded on the blade and arm surface area mixed with Isobathic resin, Catalyst, Accelerator & pigment as recondition work. | 8 | Nos | - | - |
| 4 | Charges for applying two coats of Isobathic resin for smooth finishing over the entire surface of blade, weighing of blade should be maintained 65Kgs+/-0.5 and marking the weight. | 8 | Nos | - | - |
| 5 | Charges for painting with two coats of 1st quality epoxy grey paint over the surface of the GRP fan blades including the cost of paint. | 40 | M2 | - | - |
| 6 | Cost of Epoxy Smoke Grey paint | 8 | litres | - | - |
| 7 | Cost of Epoxy Thinner | 2 | litres | - | - |
| 8 | Hire charges for Transporting (Vehicle Charge) Sl.No.1 | 1 | No | - | - |
| 9 | Cost of Putty Material for Sl.No.3 | 16 | Kgs | - | - |
| 10 | Cost of Chopped strand Material for Sl.No.3 | 64 | Kgs | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_808685.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].