| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.4 CrAccepted-AOC | ₹8.4 Cr | L-1 | Accepted-AOC This is L1 accepted |
| 2 | L-2₹8.7 Cr+₹33.3 L (3.96%)Rejected-Finance | ₹8.7 Cr+₹33.3 L (3.96%) | L-2 | Rejected-Finance Rejected |
Tender Value
₹9.4 Cr
EMD Value
₹18.8 L
Closing Date
26 Jul 2023, 12:00 pmClosed
SE, VNS CIRCLE, PWD, VARANASI
SE, VNS CIRCLE, PWD, VARANASI
G-20 (SBD)
2023_CEUVZ_822694_1
4932/183-Com-Vns Circle/2023-24 Dated 13-07-2023
Open Tender
Civil Works
Item Rate
30 days
Varanasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹18.8 L
SE, VNS CIRCLE, PWD, VARANASI
30 Oct 2023
20 Jul 2023
26 Jul 2023
20 Jul 2023
26 Jul 2023
20 Jul 2023
20 Jul 2023
Amount
Cement concrete with 2cm. gauge approved stone ballast, approve coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.(including all materials,laboure,labour cess,taxes etc but excluding GST)
Mild steel work in RCC work as per MORTH specification.(including all materials,laboure,labour cess,taxes etc but excluding GST)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 8000 metres For Divider..(including all materials,laboure,labour cess,taxes etc but excluding GST)
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 8000 metres, stacking serviceable and unserviceable materials separately (For median) .(including all materials,laboure,labour cess,taxes etc but excluding GST)
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade on M-15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409..(including all materials,laboure,labour cess,taxes etc but excluding GST)
Providing and fixing of MS Steel Railing Along Median and Railing..(including all materials,laboure,labour cess,taxes etc but excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Interlocking).(including all materials,laboure,labour cess,taxes etc but excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401..(including all materials,laboure,labour cess,taxes etc but excluding GST)
Providing and Laying of Rubber moulded (Grey colour)Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30mm thick local sand on bed, filling joints with local sand on bed, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504..(including all materials,laboure,labour cess,taxes etc but excluding GST)
Providing and Laying of Rubber moulded (Red colour)Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30mm thick local sand on bed, filling joints with local sand on bed, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504.(including all materials,laboure,labour cess,taxes etc but excluding GST)
Chequerred precast cement concrete tiles 20mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand)..(including all materials,laboure,labour cess,taxes etc but excluding GST)
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202 cement mortar. K C Drain.(including all materials,laboure,labour cess,taxes etc but excluding GST)
Construction of K.C. Drain with present CC black size (370 x 250 mm) laid flate position (37.50 mm in length) and Kerb stone (30 cm in length) including cost of all material, labour, and T&P etc complete..(including all materials,laboure,labour cess,taxes etc but excluding GST)
M/S UMA ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .