Executive Engineer
Executive Engineer PWD Buildings C and M Division Cuddalore
Special Repairs to VAO office Building at Thirumoolasthanam in Kattumannarkoil Taluk of Cuddalore District.
2026_PWD_711510_1
TN6-2/2026-2027/Dt 07.10.2026
Open Tender
Civil Works - Buildings
Lump-sum
90 days
Thirumoolasthanam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3,300
7 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 2.83 | Cu.m | - | - |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 3.71 | Cu.m | - | - |
| 3 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1.54 | Cu.m | - | - |
| 4 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 0.65 | Cu.m | - | - |
| 5 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 0.38 | Cu.m | - | - |
| 6Brick work in Cement Mortar 1 : 6 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 6.01 | For Foundation and Basement | 1.05 | Cu.m | - | - |
| 6.02 | For Superstructure in Ground floor | 0.56 | Cu.m | - | - |
| 7Brick partition walls of 11.50cm thickness using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 7.01 | For Superstructure in Ground floor | 3.78 | Sq.m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
2ThirumiilasthanamTenderconditions.pdf
Tender Documents • 1.00 MB
BOQ_854814.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .