Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
8 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TECH SIG
17 conditions · 2 needing a document upload
: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-VIII given in tender document, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex. I of Part-I of GCC-2022, with up to date correction slip.
If the tenderer submits/ upload Audited Balance sheet duly certified by a chartered accountant to fulfill the Standard Financial Criteria, the tenderer may also submit/ upload Form No. 26AS /16A along with the tender offer to certify the amount of contractual receipt.
(a) The tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work each costing not less than the amount equal to 60% ofadvertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Signal & Telecom Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Signal & Telecom Engineer in writing.
Note: A work experience certificate from a private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. As per Clause No. 10.1 of Tender Form (second Sheet) of Annex.I of Part-I of GCC-2022, with up to date correction slip
Defination of Similar Work :- "Any Signaling Work"
17 conditions · 6 needing a document upload
The tenderer must opt for payment by letter of credit (LC) as per the Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.18.
Tenderers are required to quote their Permanent Account Number in the tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer must opt for payment by letter of credit (LC) as per the Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.18.
Tenderers are required to quote their Permanent Account Number in the tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
No garbage, dry leaves, paper, grass, bushes, or any other items shall be burnt. They shall only be disposed of at the nominated disposal point by prescribed methods, duly observing the Municipal Solid Wastes (Management and Handling) Rules, 2000 indicates under Schedule II- Management of Municipal Solid Wastes: Para I.I vii that Waste(garbage, dry leaves) shall not be burnt. Any violation of the provisions of the MSW rules,2000, attracts the penal provisions of the Environment(Protection) ACT,1986.CPCB and SPCBs have also issued various guidelines/orders against the practice of such open burning. If the contractor or anybody deployed by him for this work is found guilty of unregulated open burning of plastic, rubber, waste, and similar substances, a fine of Rs. 5000/- on each occasion shall be imposed in addition to the other rights and remedies available in the contract. The decision of the Engineerin-Charge shall be final and binding in this regard.
S&T associated indoor and outdoor work for provision of Interlocking of 02 Nos. of manned LC Gate No. LC-14, 34-I in HMH-SDLP section over Bikaner Division.
SnT-BKN-2026-27-08
SnT-BKN-2026-27-08
Open
Works - General
9 Months
Bikaner, Rajasthan
₹0
₹2.2 L
8 Jun 2026
15 May 2026
25 May 2026
147 items across 14 schedules · ₹1,06,81,783.74 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | of SWR literature in English with associated mid-section gate with all corrections as SWRD & approved SIP. For all-technical corrections, editing, correction etc. are to be out and one rough print to be railways for approval before as required for final processing sanction. This also includes of maintenance cards in provided by Rly. Inspection: Inspection charges: None terms:100% after execution. | Station | 2.00 | 4,330.94 | 8,661.88 |
| 2 | of Station Working Rules from to Hindi and framing out in form (or similar software) as per practice. The required SWR in will be provided by the contractor been covered separately in item 01011800 of Chapter 1 of SOR. Consignee Inspection charges: Payment terms:100% after | Station | 2.00 | 5,389.49 | 10,778.98 |
| 3 | photocopies & binding of the SWR in English/Hindi/Diglot form as Railway practice. Inspection: Inspection charges: None terms:100% after execution. | Set | 12.00 | 214.85 | 2,578.2 |
| 4 | circuits and plans to suit layout the signalling plan of IBS/ABS/LC plans and wiring diagram shall on Auto cad Drawing and with CD. This will include supply cum Indication panel diagram, section plan, square sheet, wiring Relay rack/Relay Bus bar details, Fuse contact analysis, Relay room tag analysis, panel tag block analysis, panel diagram, IPS wiring diagram, change over diagram, Power arrangement with program Block circuit wiring diagram, Axle counter wiring diagram and relevant drawings. NOTE: The shall initially supply 2 sets of (Paper Prints) for approval of Railway will return one set to contactor duly approved with alterations/corrections, if any. The shall incorporate Railways' corrections/ comments, if any, tracing & CD without any deviation all the tracings and Final CD with all respect for Approval of After Approval of Railways on the contractor shall submit 3 final approved diagrams to the within 15 days. He shall ensure has a block for signature of official as well as a block for of firm, duly signed by the signatory of the firm. The the work as given by Railways written on every sheet under the column. All the drawing shall be in a good quality folder for each Gate. Inspection: Consignee charges: None Payment after execution. | Lot | 2.00 | 17,305.01 | 34,610.02 |
| 5 | and supply of laminated one the completion plans including diagrams and indoor as well as completion documents on 75-micron polyester film for Mid- Interlocked LC Gate (OSL) on Auto (Six) sets xerox copies will be for each of the documents below: Cable Route Plan, Cable Location details plan for all Cable termination details, Plan, SWR Diagram, Wiring Contact Analysis, Fuse and Tag Analysis of Relay Rack and CT Rack, Cum Indication Panel/VDU Power Panel Diagram, Track Plan, Rack Erection Plan and Box details etc. Inspection: Inspection charges: None terms:100% after execution. | LC Gate | 2.00 | 10,071.65 | 20,143.3 |
| 6 | Indoor wiring at Mid-Section LC Gate (OSL). It includes PVC insulated indoor Railway cable @40<45@Core/40-Core) sqmm as per RDSO Spee. No. (Amnd.2 or latest) for wiring relay room and SM's/Panel room room to DP in SM office for block This also includes supply of PVC jumper wires of multi strand tinned in all colours as per Spec.No.IRS-S-76/89 (Amnd. 2 or This item will include bringing all supplies from power room to bus bars on relay racks by sqmm copper flexible wire as instructions of engineer incharge. This include wiring between control relay room if required. All will be done as per standard of North Western Railway with dressing & threading. The item supply & wiring of tag block, fuse (G-Type and ND-Type) and all related material required for indoor relay room wiring at mid- interlocked LC Gate. Inspection: Inspection charges: None terms:100% after execution. | Per Gate | 2.00 | 11,578.18 | 23,156.36 |
| Schedule total | ₹99,928.74 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SnT-BKN-2026-27-08.pdf
ATTACHMENT
GCCCS1.pdf
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
GCCCS2.pdf
ATTACHMENT
GCCCS11.pdf
ATTACHMENT
GCCCS7.pdf
ATTACHMENT
GCCCS9.pdf
ATTACHMENT
GCCCS4.pdf
ATTACHMENT
GCCCS5.pdf
ATTACHMENT
GCCCS8.pdf
ATTACHMENT
GCCCS10.pdf
ATTACHMENT
GCCCS3.pdf
ATTACHMENT
GCCCS6.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .