Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC HIG 40 TYPE B DEV PRAYAGAM ADA COLONY JHALWA PRAYAGRAJ U P 211015 | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211015 | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 CrRejected-Finance A 94 SECTOR P 3 GREATER NOIDA G B NAGAR | GREATER NOIDA | G B NAGAR | U P | ₹1.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 CrRejected-Finance | ₹1.5 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical GEEJGARH ROAD SIKANDRA SIKANDRA CHORAHA SIKANDRA DAUSA RAJASTHAN 303326 UDYAM RJ 12 0005159 | DAUSA | RAJASTHAN | 303326 | - | - | Rejected-Technical DIS-QUALIFIED |
| 5 | Rejected-Technical B 108A SECTOR 36 GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | - | - | Rejected-Technical DIS-QUALIFIED |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
16 Feb 2026, 5:00 pmClosed
GM_PROJECT
GNIDA OFFICE
P/L Grass Paver, Construction of RCC drain and brick drain work along S.K. road (Service road) both side (Durga rotary to Mosservaier rotary) Greater Noida
2026_GNIDA_1112638_13
SM/(E-TENDER CELL)/2026/711 DATED-02.02.2026
Open Tender
Civil Works
180 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹2,720
₹3.1 L
23 Jun 2026
6 Feb 2026
18 Feb 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR/251 (A)/4.1.1)
Cartage of earth or fly ash when added to schedule item no. 253 : 1st Km. (if lead is beyond ½ Km) SOR-20/261(b))
Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). (DSR-18/16.2)
Granular sub-base with graded material, plant mix method Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. MORTH/4.01/401(A)
Providing and fixing at or near ground level factory made RCC pavement slab of M-30 grade of size 450x450x70 mm, including reinforcement with 6 mm dia M.S. bars 4 nos on each side, including setting in position in footpath to the required level and line over a bed of 20 mm average thick cement mortar 1:3 (1 cement : 3 coarse sand), having joint thickness not more than 5mm except on curve, including filling of joints with same cement mortar and making grooves etc. complete as per direction of Engineer-in-charge. (AR/GNIDA)
Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR/251 (A)/4.1.1)
Cement concrete with 4cm gauge Approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work
8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08)
Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II)
RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II)
Steel reinforcement for RCC work including straightening cutting bending placing in position and binding all complete upto plinth level
Thermo Mechanically treated bars of grade Fe-500D or more. (SAIL Steel) (DSR-18/5.22.6/AR)
M-150 brick work in 1:6 cement & fine sand 1.25 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303) same as item no 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-20/305) Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(A))
2 cm thick Damp proof Course with Cement and approved coarse sand 1:2 with and including water proofing as ordered by the Engineer in-charge in the proportion as by the manufacture including supply of all materials, labour, Tools & plants etc. required for proper completion of the work and including proper curing & Shutterings as necessary. (SOR-20/7.01/360)
Labour cess and GST will be paid extra as per Govt. orders.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.59 MB
PreQ_Grasspaver_SKroad.pdf
Tender Documents • 0.87 MB
BOQ_2058252.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid