Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹5,500
Closing Date
10 Jun 2022, 1:00 pmClosed
SE ETC I MORADABAD
220 KV S/S CAMPUS, MAJHOLA, MORADABAD
LOADING, CARRIAGE AND UNLOADING SHIFTING AND REPLACEMENT OF GASKET OF 40 MVA TRANSFORMER FROM 132 KV SUB-STATION BACHHRAON, AMROHA TO 132 KV SUB-STATION KAILA DEVI UNDER ETD-SAMBHAL
2022_UPTCL_683711_2
E-T-06/ETCM/2022-2023
Open Tender
Electrical Works
Fixed-rate
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC MORADABAD
₹5,500
11 Aug 2022
30 Apr 2022
10 Jun 2022
30 Apr 2022
10 Jun 2022
30 Apr 2022
Amount
The following work are to be carried out under ETD- Sambhal.
Partly dismantling of 40 MVA T/F for carriage of main tank at 132 KV S/S Bachharaon. (Crane shall be arranged by the contractor).
Shifting/ Dragging of 40 MVA Transformer from existing place to near loading place at 132 KV Sub-Station Bachhraon distance up to 20 Mtr.
Additional shifting 10 mtrs @ 5 mtrs per job.
Loading of 40 MVA T/F main tank along with accessories, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle.
Packing of HV/LV/N Bushing of Transformer.
Carriage of 40 MVA T/F tank from 132 KV Sub-Station Bachhraon, to 132 KV Sub-Station Kaila Devi along with all accessories by Pvt. Truck / Trailer. Distance about 80 Km.
Unloading of main tank of 40 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 40 MVA T/F like oil filled drums, bushing conservator tank, cooling fan etc. from Track/ Trailer at site at 132 KV S/S Kala Devi
Shifting / dragging of 40 MVA Transformer from unloading place to plinth upto 20 mtrs distance including turning of Transformer if required including all T & P and other works to complete the job satisfactory.
Additional shifting 20 mtrs @ 5 mtrs per job.
Replacement of gasket of radiator / Bushing / pipe line only open part. Except Top Cover of Transformer by providing and fixing of new gasket as per existing size made of rubberized cork sheet Kotika / Turborze brand grade.
Perfect Power Transformer Associates
SHILPA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .