| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance BHIKAJI CAMA NEW DELHI DELHI 110066 | NEW DELHI | DELHI | 110066 | Admitted-Finance |
| 3 | Admitted-Finance C 185 PHASE 1 NARAINA INDUSTRIAL AREA NEW DELHI 110028 | NEW DELHI | DELHI | 110028 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Technically Not at Par |
| 5 | Rejected-Technical | Rejected-Technical Technically Not at Par |
Tender Value
Refer Docs
Closing Date
17 Mar 2021, 4:00 pmClosed
GM Engg
Scope Complex, Core 8, Lodhi Road, New Delhi
Design, Supply, Installation, Testing and Commissioning of 300/ 160 kWp Grid Connected Roof Top Solar PV Power Plant at Sivagiri, Arruvipuram, Chembazanthi and Kunnumpara at Kerala.
2021_ITDC_71664_1
ITDC/Engg/Kerala/Solar/2021
Open Tender
Miscellaneous Works
Works
180 days
Scope Complex, Core 8, Lodhi Road, New Delhi
Please refer Tender documents.
18 documents required · 18 mandatory
₹0
Exempted
6th Floor Conference Hall
12 Jul 2021
1 Mar 2021
18 Mar 2021
1 Mar 2021
17 Mar 2021
1 Mar 2021
8 Mar 2021
Amount
300/ 160 kWp Grid Connected Roof Top Solar PV Power Plant
Degin, Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/ conduit lugs and other accessories etc. as required. Site Location : 1. SIVAGIRI & ARRUVIPURAM= 300 KWP X 2 nos. 2. CHEMBAZHANTHI & KUNNUMPARA = 160 KWP X 2 nos.
QI NETWORK ENTERPRISE PVT LTD
D & G Construction
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .