Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.0 L+₹37,277.70 (3.89%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.1 L+₹1.5 L (16.1%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹13.1 L+₹3.5 L (36.9%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹1.5 L
EMD Value
₹30,200
Closing Date
30 Oct 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
MGCC DIV 15 MBD
Construction of V.R.B at km 9.900 of Prahladpur Dy.Under Madhya Ganga Project Stage-II
2021_UPIDC_629668_2
02/EE/2021-22
Open Tender
Civil Works - Canal
Item Wise
45 days
Chandausi
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹30,200
20 Oct 2022
25 Oct 2021
1 Nov 2021
25 Oct 2021
30 Oct 2021
25 Oct 2021
90 days
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T&P, leads and lift etc compltete.
Providing and Laying M-10 (C.C. 1:3:6) cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work /Cum
Providing and Laying lean concrtet (1:4:8) cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work /Cum
Providing first class M-100 brick work in 1:4 Cement Mortar including cost of all materials, labour T&P, etc. for proper completion of work.
Providing and fixing Centering & shuttering for R.C.C. and C.C. works (form work of concrete) i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum
Providing and Laying M-25 C.C. 1:1:2 cement concrete i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum
Reinforced Cement concrete 1:1.5:3 (M-20 Grade) in nominal mix design with using 7.90 cement bags /m3 (cement, coarse sand and crushed aggregate)i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work/Cum
Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all labour and T&P etc. for proper completion of work.
Providing and fixing of 75 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing, labour, T&P, etc compete as per direction of Engineer-in-charge.
Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P etc. for proper completion of work.
Providing and fixing of expansion joint with angle iron 75x75x10 mm size, with M.S. flat 32x6 mm, filled with bitumen and stone dust including cost of all material, labour, T&P, etc. compete as per direction of Engineer-in-charge.
Providing and painting Bitumen (85/40 grade ) in two coats including cost of all material, T&P, heating, labour etc compete as per direction of Engineer-in-Charge
Providing and laying of two coats of tar felt including cost of all materials, T&P, labour etc compete as per direction of Engineer-in-Charge
Earth work in filling or in embankment in ordinary soil for Approach Road/(Diversion) to be in 20 cm layers including ramming and dressing the surface to be required levels and slopes also, including 1.5 metre lift and lead upto 600 metre. including cost of earth, all T&P, labour, loading, unloading etc. for proper completion of work as directed by Engineer-in- charge.
Earthwork in removing of Diversion including cost of labour, all T&P, leads and lift etc. for proper completion of work.
Providing Brick on Edge pitching including cost of all materials, labour, T&P etc. for proper completion of work.
Providing & Fixing wheel guard of size 150 x 150 x 900/Nos.
Providing weep holes in abutment & wing walls including supply of all material, labour, T&P etc required for proper completion of work
universal enterprises
M/S VIPIN KUMAR CONTRACTOR
DHARIWAL CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .