| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹1.9 L+₹1,440 (0.77%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance found eligible | |
| 3 | 3₹1.9 L+₹3,540 (1.89%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
22 Jun 2021, 4:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Shifting of 200 HP motor no. 03 along with the pump to avoid submergence due to increase in water level in Chenab river with allied works at LIS Ambaran.
2021_IFC_127242_1
11/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹4,200
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
24 Jun 2021
14 Jun 2021
23 Jun 2021
14 Jun 2021
22 Jun 2021
15 Jun 2021
16 Jun 2021
Shifting of 200 HP motor no. 03along with the pump to avoid submergence due to increase in water level in Chenab river at LIS Ambaran. The job involves decoupling the motor from pump and unfastening the foundation nuts and bolts by using suitable tools & tackles and skilled manual labour . Thereafter shifting the motor by using manual labour to a safer place . The job also includes shifting of the pump to safer place by employing manual labour. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation
Repair to 200 HP motor of pumping unit no. 2 installed at LIS Ambaran . The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply.. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc . P/F of driving end bearing and non driving end bearing as per sample . Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Providing/fitting of driving end and non driving bearings . Assembling of the motor . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. Complete Job
Repairs to 6cusec discharge / 56 m head HC pump of pumping Unit No. 2 installed at LIS Ambaran . The Job involves de-coupling of pump from the motor and removing the top cover, extraction of shaft and impeller assembly together with bearing bracket and shifting to the workshop by using manual labour and mechanical transport. Complete dismantling of impeller assembly. Rebuilding of pump shaft and impeller by using good quality electrodes .Turning and machining of rebuild impeller and pump shaft for proper size . Providing/ fitting of DE and NDE bearings, (2nos) and bushes ( 2 nos.) in lieu of worn out ones. Fabrication of glands and studs with nut. Fabrication of neck rings as per sample. Repair to bearing brackets . Re-assembling of impeller shaft assembly and shifting back to site and placing it at its position and closing the top cover along with P/F new nuts ,bolts , oil paper packing and studs coupling with motor. P/F of gland packing etc. . The job also includes repairing of delivery line by welding at the leaking portions. Testing the pump on no load. The Job includes cost of material, labour(skilled and unskilled), loading charges, hire charge of tool and tackles, to and fro carriage charges . Complete job
Repairs to 200 HP Starter of pumping unit of pumping unit no. 2 installed at LIS Ambaran . The job involves disconnecting the starter and then shifting the starter to the workshop through mechanical transport . The job involves complete replacement of worn out G.M Nuts and washers, bakelite strips, fingers, contacts moving and fixed as per sample. Replacement of tripping coil of required capacity, complete kit. Complete drainage of T.oil, Providing/Filling of fresh T.oil (10 Ltrs.).. Replacement of worn-out thimbles of cables etc. Shifting the starter to the LIS .Connecting power supply and testing at load. Complete Job includes cost of material, tools and tackles, labour charges transportation charges at site of LIS, Complete Job
M/S FASTTRACK ENGINEERS
PERFECT ELECTRICAL WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .