Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.7 Cr+₹95,053.48 (0.26%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | Rejected-Technical 251 TATA KANDRA MAIN ROAD ADITYAPUR SERAIKELLA KHARSAWAN JHARKHAND PIN 831013 | SARAIKELA KHARSAWAN | JHARKHAND | 831013 | - | Rejected-Technical technical not qualified | |
| 4 | Rejected-Technical AT M ROAD NEAR KAMANI CENTRE BISTUPUR JAMSHEDPUR | EAST SINGHBUM | JHARKHAND | 831001 | - | Rejected-Technical Characer Certificate Expired |
Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
21 Sept 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Construction of Thirteen 13 Unit of Community Toilet/Public Toilet/Aspirational toilet 9 seater in different locations under Adityapur Municipal Corporation
2026_UDD_118727_2
UDD/AMC/03/2026-27
Open Tender
Civil Works
Percentage
455 days
Adityapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹25,000
₹7.3 L
Yes
22 Nov 2026
14 Sept 2026
23 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil & disposal of surplus excavated soil as directed, within or outside the site at an unobjectionable place. i) All kinds of Soil | 1,440.14 | Per M3 | 151.82 | ₹2,18,642.05 |
| 2 | Extra for earth work in hard soil as per specification and direction of E/L. (vide classfication of soil item - B) | 502.06 | Per M3 | 15.51 | ₹7,786.95 |
| 3 | Filling in foundation trenches and plinth in layers exceeding 150 mm, thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5M all complete as per building specification and direction of EA (Mode of | 836.29 | Per M3 | 55.28 | ₹46,230.11 |
| 4 | Providing coarse clean sand in filling in foundation treaches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes ali complete as per building specification and direction of EA. (Mode of measurement compacted volume) | 12.35 | Per M3 | 589.51 | ₹7,280.45 |
| 5 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 | 420.16 | Per M3 | 122 | ₹51,259.52 |
| 6 | Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2(1 cement: 2 Coarse sand) to match the existing floor: With Chlorpyriphos E.C. 20% with 1% concentration | 960.83 | Per M2 | 253.14 | ₹2,43,224.51 |
| 7 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 533.78 | Per Ltr. | 191.57 | ₹1,02,256.23 |
| 8 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 860.86 | Per M2 | 351.75 | ₹3,02,807.51 |
| 9 | Providing and laying in position cement concrete of specified grade excluding cost of centering & shuttering. All work up to plinth level:1:4:8(1 Cement :4 Fine Sand : 8 Graded stone aggregate of 40MM) | 22.88 | Per M3 | 3,751.64 | ₹85,837.52 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level: 1:2:4 (1 Cement: 2 coarse sand (zone-III): 4 graded stone aggregate 40 mm nominal size) | 55.64 | Per M3 | 4,503.43 | ₹2,50,570.85 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
13_toilet_sbd.pdf
Tender Documents • 17.70 MB
BOQ_160553.xls
BOQ • 0.37 MB
toilet13_page5_11.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .