Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance | +0.00% | ₹6.7 L | L1 | Admitted-Finance |
| 2 | L1₹6.7 LAdmitted-Finance | +0.00% | ₹6.7 L | L1 | Admitted-Finance |
| 3 | L1₹6.7 LAdmitted-Finance | +0.00% | ₹6.7 L | L1 | Admitted-Finance |
| 4 | L2₹6.7 LAdmitted-Finance | +0.01% | ₹6.7 L | L2 | Admitted-Finance |
| 5 | L3₹7.0 LAdmitted-Finance | +4.50% | ₹7.0 L | L3 | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹21,200
Closing Date
5 Mar 2026, 3:00 pmClosed
Executive Engineers E(EnM)M-9
C-2A Block Opp. Geeta Mandir Janakpuri
Deployment Of Staff For Operation, Watch and Ward Of Booster Pumping Stations In Ac-30.
2026_DJB_287941_16
e-NIT No.28 / (EnM)M-9/ 2025-26
Open Tender
Civil Works
90 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Account No. 50448339804
₹21,200
7 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
Deployment Of Staff For Operation, Watch & Ward Of Booster Pumping Stations In Ac-30.
Operation, watch and ward of all (E&M) equipment installed in various Clear Water Booster Pumping Stations (BPSs), which includes Motor pump-sets, electric control panels, valves, and other auxiliary components with different capacities. To ensure continuous and efficient operations during designated supply hours, two suitably experienced workers are to be deployed at each BPS on break-duty shifts. These workers shall be responsible not only for operating the systems but also for routine monitoring and minor upkeep of the installed infrastructure. The assigned tasks under this job include the following: • Supervision and routine operation of Motor, pump-sets and electrical & Mechanical systems and Minor electrical works. • Minor maintenance and replacements of asbestos graphite packing in Pump/valve, Kit-Kats, tube lights/bulbs, switches, sockets, and fuse links including servicing and adjustment of valve as needed. • Periodic tightening of connections in control panel boards, cleaning carbon deposits from panel/motor terminal connection plates, Correction of phase sequence, if found incorrect during operation and attending to any exposed wiring or components. • Maintaining operational log books and recording all daily activities and abnormalities. • Cleaning and general housekeeping of the pump house area to maintain a safe and hygienic working environment. This work is to be carried out at the following booster pumping station sites: 1. A-1/A, Block, Janakpuri 2. C-1/A, Block, Janakpuri 3. C-4/D, Block, Janakpuri 4. C-6/A, Block, Janakpuri 5. C-3/A, Block, Janakpuri Note: Spares / Material required for replacement in minor-maintenance will be provided by the department. Total no. of staff deployed: 10 Nos. (Un-Skilled worker: 5 Nos and Semi-skilled worker: 5 Nos.) Period: 90 Days x 3Shift= 270 Shifts
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_381749.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid