Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.0 LAccepted-AOC | ₹79.0 L Quoted ₹78.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹88.6 LRejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹88.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | NITHYASHREE ENTERPRISES L1 | R RAMACHANDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Providing Cup lock metallic scaffolding arrangements inside the boiler furnace upto the radiant roof & 1st pass slope, platen super heater of level 50mtr for Hydro Jet Cleaning of boiler tubes and dismantling the scaffolding after the work, includes hire charges for cup lock metallic scaffolding material, consumables and T&P’s etc., in 210 MW boiler Unit-III at NCTPS-I. | 670 | Opns | 7,065 ₹47.3 L | 7,400 ₹49.6 L |
| 2.00 | Charges for complete cleaning of furnace and 1st Pass heating surface upto 50 mtr elevation by high pressure Hydro Jet Machine. Work involves arrangement of pumps and accessories at site, jet cleaning the furnace, heat transfer surface of 1st pass water wall tubes, roof tubes, goose neck region, platen super heater coils, scraping the tubes surfaces if required; Removal of residue from the bottom ash hopper completely. Including hire charges for pump, consumables and T&P’s | 2,500 | Sq.m | 1,264 ₹31.6 L | 1,560 ₹39 L |
Tender Value
Refer Docs
EMD Value
₹85,900
Closing Date
31 Oct 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Providing cup lock metallic scaffolding arrangements inside the boiler furnace up to the radiant roof to facilitate for inspection and tube thickness survey in water wall and platen SH inspection
2025_EB_615637_1
CE SE MI NCTPS I 208 25 26
Open Tender
Power/Energy Projects/Products
21 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹85,900
Yes
4 May 2026
18 Oct 2025
1 Nov 2025
18 Oct 2025
31 Oct 2025
18 Oct 2025
Amount
Providing Cup lock metallic scaffolding arrangements inside the boiler furnace upto the radiant roof & 1st pass slope, platen super heater of level 50mtr for Hydro Jet Cleaning of boiler tubes and dismantling the scaffolding after the work, includes hire charges for cup lock metallic scaffolding material, consumables and T&P’s etc., in 210 MW boiler Unit-III at NCTPS-I.
Charges for complete cleaning of furnace and 1st Pass heating surface upto 50 mtr elevation by high pressure Hydro Jet Machine. Work involves arrangement of pumps and accessories at site, jet cleaning the furnace, heat transfer surface of 1st pass water wall tubes, roof tubes, goose neck region, platen super heater coils, scraping the tubes surfaces if required; Removal of residue from the bottom ash hopper completely. Including hire charges for pump, consumables and T&P’s
R RAMACHANDRAN (BID ID -1498814)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_735576.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid