| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹1.3 Cr+₹16,477.50 (0.13%)Rejected-AOC | ₹1.3 Cr+₹16,477.50 (0.13%) | L2 | Rejected-AOC allotted to lowest bidder |
| 3 | L3₹1.3 Cr+₹2.6 L (2.08%)Rejected-AOC | ₹1.3 Cr+₹2.6 L (2.08%) | L3 | Rejected-AOC allotted to lowest bidder |
| 4 | L4₹1.3 Cr+₹3.2 L (2.53%)Rejected-AOC | ₹1.3 Cr+₹3.2 L (2.53%) | L4 | Rejected-AOC allotted to lowest bidder |
| 5 | L5₹1.3 Cr+₹4.2 L (3.33%)Rejected-AOC HOUSE NO 85 BBDC ROAD PO SILONIJAN PS BOKAJAN KARBI ANGLONG 782460 | SILONIJAN | KARBI ANGLONG | ASSAM | 782460 | ₹1.3 Cr+₹4.2 L (3.33%) | L5 | Rejected-AOC allotted to lowest bidder |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
15 May 2020, 2:00 pmClosed
SE, PWD (R and B)
SE, PWD(R and B) , Diphu Circle-1, Diphu
Construction of road from NH-39 at No.3 Dilawjan to RJ road
2020_KAAC_17448_1
DPU/SOPD-G/06/2020/11R
Open Tender
Civil Works – Roads
Item Rate
360 days
Barpathar
Registered under Assam PWD
5 documents required · 5 mandatory
₹2,269
Empowered Officer,ASRB,Assam
₹2.3 L
Yes
20 Aug 2020
8 May 2020
18 May 2020
8 May 2020
15 May 2020
8 May 2020
8 May 2020 - 15 May 2020
Amount
Clearing and Grubbing of road land including up rooting rank vegitation grass, bush, shrubs, sapllags and tress of girth upto 300 mm removal of stumps of trees cut earlier and diposal of unserviceable materials and staking of serviceable materials to be used or auctioned, up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201.. i) By Manual means A. In area of non thorny jungle.
Construction of Embankment with materials obtained from borrowpits, with a lead up to 1.50m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 & 300.2 with a lead up to 1000m as per Technical SpecificationClause 301.5. A) From private land
Construction of sub grade and earthen shoulders with approved materials obtained from borrow pits, with all lifts & lead transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 with a lead up to 1000m as per Technical SpecificationClause 303.1. a) From private land
Construction of Granular sub-base providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80 - 100 KN Static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401. (ii)For Grading II Material
Providing laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheels steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (A) By manual Means
Providing laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheels steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. (A) By manual Means
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70-1.0kg/sqm. Using mechanical means as per technical specification Clause 502
Providing and applying track coat with bitumen emulsion (RS-1) pressure emulsion distributor at the rate of 0.25-0.30 kg. Per spm. On the prepared bituminous /granular surface cleaned with Hydraulic broomas per technical specification Clause 503
Semi Dense Bituminous Concrete (Providing and applying semi dense bituminous concrete with 100-120 TPH with batch type HMP producing an average out put of 75 tonnes per hour using crushed aggregate of specific grading, premixed with bituminous binder @ 4.5-5 % of mix and filler and tranporting the hot mix to the work site, laying with hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheel roller, vibratory and tandem rollers to acvhieve the desired compaction as per MORT@H Cl. no. 508 complete in all respect ( including carriage upto initial lead of 5.00 from quarry and carriage of mixed materials up to 10.00km initial lead at site and laboratory as directed by the deparment ) A. With hydrated lime/cement as filter ( refer table 500-9 of MoSRT&H specification) (I) 'with 60/70 or VG-30 grade bitumen (ii) for GradingI (13 mm nominal size)
Cross Drainage Structures ( For 1000 mm dia H.P. Culvert).
Kilometer Stone: ii ) Ordinary Kilometer stone ( precast)….
Sri Madhurjya Saikia
JOYRAM GOGOI
SRI BABUL CH. DAS
Binit Saha
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .